A loft conversion and a re-roof touch the same rafters, so the rules arrive together. Here is what each regulation says about the roof, and why the order of the work matters.

Get a written quote

Call 01493 277103WhatsApp us

Old conservatory behind a brick semi with roofers working above

The short answer

Yes, and the two jobs sit well together, because the rafters are already exposed and Building Regulations cover both. A retained roof above 0.35 W/m²K is upgraded to 0.16 where feasible, roof windows have their own ratings, and dormers need planning permission in the Broads and in conservation areas.

Why a conversion and a re-roof meet

A loft conversion turns a cold roof space into a room, so the roof stops being only a weather layer and becomes the room's ceiling and walls. Whatever is done to the covering, the insulation and the openings has to work for the people sleeping beneath it. Scaffold, tile removal and battens are the same operations either way, which is why builders look at the two jobs together.

The Planning Portal sets a test for re-roofing alone: the work is not normally caught by Building Regulations when less than 25 per cent of the 'building envelope' is affected and less than 50 per cent of the roof is. Stripping the whole roof fails the second limb, and a conversion brings an application of its own whatever the covering. Inspection is done by the council's building control team or a registered building control approver, so the route gets confirmed with them at the outset.

A scaffold that blocks the footway or the carriageway needs a highway licence from the county council, and we arrange the licence with our scaffolder. The Building Regulations for re-roofing page explains that 25 and 50 per cent test more fully.

Insulation, U-values and the roof you keep

Approved Document L, in its 2021 edition for England, gives numbers for a home's roof. Table 4.2 covers new fabric and sets 0.15 W/m²K. Table 4.3 covers existing elements: a threshold of 0.35 and an improved value of 0.16. In a loft conversion, a retained roof above 0.35 is upgraded to that 0.16 wherever feasible, and so is a renovated one. Where the full 0.16 is out of reach, or would take longer than 15 years to repay, paragraph 4.13 accepts whichever U-value is the lowest achievable inside a 15-year payback.

Paragraph 11.3 adds a size test. Renovate more than 50% of the roof's surface and the entire roof is brought up where feasible, which a re-roof over a conversion will do. AD L 2026 takes effect from 24 March 2027 only, so the 2021 text governs for now.

Insulation has a VAT note attached. HMRC's Notice 708/6 treats insulation of roofs or lofts as zero-rated for supplies "made between 1 May 2023 and 31 March 2027", with 5% to follow from 1 April 2027. New tiles and battens are not on the list, so only the insulation itself gets the relief.

The insulating when re-roofing page goes through the build-up options.

Energy terms used above

  • U-valueHeat passing through a surface; lower is better
  • 0.35Threshold above which a retained roof is upgraded
  • 0.16Improved value in Table 4.3
  • Where feasibleAD L's condition on upgrading

Escape, windows and the 4.5 m line

Approved Document B, the fire safety volume, covers how people get out of a converted loft. Its wording is that an emergency escape window serves any storey that is a maximum of 4.5 m above ground level. Create a storey higher than 4.5 m and paragraph 2.5 asks for either a protected stairway or an alternative escape route, with paragraph 2.23 adding a sprinkler option when the layout is open plan. The edition is the 2019 one incorporating 2020, 2022, 2025 and 2026 amendments and forthcoming 2029 changes, for use in England.

When a window is the escape route, paragraph 2.10 asks for 0.33m2 of clear opening at least, 450mm high and 450mm wide at least, with 1100mm as the greatest height of the opening's lower edge. A roof window can serve as that opening, so choosing one has to satisfy the escape rule and the energy figures together.

For energy, AD L 2021 asks of a replacement roof window 1.4 W/m²K, or alternatively WER Band B, as the floor, and sets a rooflight at 2.2. The adding roof windows during a re-roof page covers the fitting side of that choice.

Planning for dormers, roof windows and listed homes

Under Class C of the permitted development order, re-roofing a house is normally permitted development, and a roof window is covered by the same class provided it stands no more than 0.15 metres proud of the slope. A window on a side slope must be obscure-glazed, and it cannot open unless the opening part sits more than 1.7 metres above the floor of the room it serves.

A dormer is a roof enlargement and belongs to Class B. Class B does not apply on article 2(3) land: the Broads, conservation areas and National Landscapes. There a dormer needs planning permission, and in the Broads the Broads Authority decides, as the local planning authority for its executive area. A flat has no householder rights at all. A listed home keeps those rights, while any work touching its character calls for listed building consent as well.

The planning or building-control route is checked with the council, or with the Broads Authority where that applies, ahead of any work. The planning guide has the wider picture, and the roof replacement hub covers the re-roof itself.

Myth

Re-roofing needs no permission, so a dormer needs none either.

Fact

A dormer is a roof enlargement and needs permission on article 2(3) land.

Questions and answers

Does a loft conversion mean the chimney has to come down?

No, a chimney can stay. Taking out a chimney breast is separate work, which always needs Building Regulations approval, since the breast counts as part of the structure. If the breast shares a party wall, the building owner serves the neighbour a notice at least two months before the date on which the proposed work will begin.

Is a roof window the same as a rooflight?

The energy rules treat them as two items: 1.4 W/m²K or Window Energy Rating Band B applies to a roof window, and 2.2 W/m²K to a rooflight. The design of the conversion decides which one a given roof needs, so the survey settles that question before any window is ordered or priced.

Who checks that the roof work complies?

Building control does, through the council's team or a registered building control approver. In Great Yarmouth Borough Council and East Suffolk Council areas, ask that council's building control team directly, because each runs its own service and the right contact depends on which council covers the house. Planning is a separate question, which goes to the Broads Authority only for land inside its executive area.