Does re-roofing a Beccles house need a building regulations application?
The short answer
A full re-roof does, because it affects more than 50 per cent of the roof. A smaller repair normally needs none if it stays under both Planning Portal limits.
The Planning Portal sets the test. No building regulations application is normally needed where "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected". Both limits have to hold at once. Stripping and recovering a whole Beccles roof goes past the second one whatever the covering, so that job goes to building control before the old tiles come off.
Weight is the other trigger. Approval is needed for a new covering "15 per cent or more" heavier than the old one, and the Planning Portal advises having a structural engineer or surveyor look at the roof first. The same applies if a new covering would perform very differently in a fire. For that reason the survey looks at the rafters, purlins and wall plates under the old covering, not only at the tiles on top.
For a Beccles address, check with East Suffolk Council's building control team, or use a registered building control approver instead; either can sign the work off. That holds on the part of town inside the Broads Authority's executive area too, since the Authority decides planning there and nothing else. Our roof repairs page covers the smaller jobs that sit under both limits.
What the survey covers on a Beccles re-roof
- Covering: slipped, cracked or missing tiles and slates
- Ridge and hips: bedding, fixings and any open joints
- Verges and valleys: mortar, dry-fix parts and linings
- Flashings where the roof meets a wall or chimney stack
- Rafters, battens and underlay, seen from inside the loft
- Gutters and downpipes carrying rain off the roof