Does a Hales re-roof go to South Norfolk or to CNC?
The short answer
Both, for separate questions: South Norfolk Council decides planning, while CNC Building Control deals with building regulations on a whole-roof job.
Planning for a Hales address belongs to South Norfolk Council. Building regulations sit with another body, CNC Building Control, a partnership of five councils (South Norfolk, Norwich City, Broadland, King's Lynn & West Norfolk and Fenland), which serves this area from its Norwich office on 0808 168 5041. A registered building control approver can also carry out that function, privately.
The Planning Portal sets the re-roofing test. No building regulations application is normally needed where "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected". Both limits must hold together. Stripping and recovering the whole of a Hales roof goes beyond the second limit, irrespective of the tile or slate laid back, which puts a full re-roof in front of building control before the old covering comes off. A repair to a few tiles or a section of ridge stays under both limits.
CNC's own guidance says "If the repair work is significant, or the building is thatched then the Building Regulations may apply." Its guide to roof build-ups also separates the two main types: a warm roof is described as needing no ventilation, a cold roof as needing it. Which kind a Hales house has can only be judged from inside the loft, so the survey reads the insulation, underlay and rafters up there and builds the quote on that.
Two roof build-ups in CNC's guide
Warm roof
- No ventilation is required
- Wording from CNC's guide
Cold roof
- Ventilation is required
- Wording from CNC's guide