Lead roofing

Lead Bay Window Roofs

A bay window roof is a small, angled roof stuck onto the front of a house, and most of the weatherproofing is dressed lead. This guide covers how that lead is shaped, where it fails and what a repair or relead involves.

Get a written quote

Call 01493 277103WhatsApp us

A roofer dressing lead flashing round a brick chimney stack

What a bay window roof is made of

A bay window pushes out from the wall of the house, and the roof over it is a separate small roof with its own structure. The outline is set by the window below: a square bay has three straight sides, a canted bay has angled faces, and a bow is curved. Whatever the plan, the roof has to shed water in every direction at once and meet the main wall at the back. Each extra face adds a hip and a length of joint, so a three-faced bay has more places to go wrong than a plain square one.

The covering can be sheet lead, because lead can be dressed, which means shaped by hand and with wooden tools, around the angles where a stiffer material would need cutting and sealing. The lead sits on a timber deck, with a separating layer between the wood and the metal, and the deck is carried on rafters or joists that are tied back to the house.

Some bay roofs are pitched, with tiles or slate and lead only at the hips and the back. Others are nearly flat, with lead over the entire top. The difference matters for repair: a pitched bay roof has a tiled covering and a few lead details, and a flat-topped one is a lead roof in miniature, with all the movement and falls that a larger lead flat roof has.

Bays on period houses are built from several different materials at once: brick or stone below, timber windows, a timber roof structure and a metal skin over it. Each moves at its own rate, and the lead sits above all of them. That mix is why bay roofs, small as they are, can be among the harder roofs on a house to keep dry, and why the timber, the masonry and the metal all need to be read together on a survey, not one at a time.

Dressing lead round the angles

On a canted bay, the roof faces meet at hips. Where two faces of lead meet at an angle, the sheet is not cut and sealed; it is folded and dressed so that one piece wraps the corner, sometimes over a timber roll. It is hand work in the plain sense that the lead is worked cold into shape and left free to move.

Corners are where thin spots arise, and a thin spot cannot be seen from the ground. Pushing lead into a tight angle stretches it, and stretched lead that is also exposed to sun and frost can crack at the fold. A good dressing leaves enough slack at the angle for the lead to move later, and a repair that stiffens the corner with filler or a patch can make the next crack come sooner.

The front edge of the bay roof, over the window head, takes a drip: a short step or an edge fold that throws water clear of the window below. The lead is dressed over the edge and held by clips so wind cannot lift it. Where the front edge has been fixed with face nails or filled with mastic, the lead has been pinned in place, and pinned lead splits.

Terms on a bay roof

  • HipAngle where two roof faces meet
  • DressingShaping lead by hand to a form
  • AbutmentWhere the bay roof meets the wall
  • Drip edgeFront fold that throws water clear
  • ClipHidden fixing that holds a lead edge
  • DeckBoards the lead is laid on

The abutment where the bay meets the wall

The back of the bay roof butts against the main wall of the house, and that is the longest joint on it and the one that carries the wall's run-off. Rain runs down the wall onto the roof, so the wall and the roof have to be joined by a detail that lets water pass over, not into, the junction. On a lead roof the sheet turns up the wall as an upstand, and the top edge is covered by a separate flashing set into the brickwork or masonry, or by a lead apron.

That flashing is chased into a mortar joint, wedged in and pointed, or sometimes fixed over the face with a cover strip. Both can fail. Pointing shrinks and drops out, wedges loosen, and a bead of mastic that has replaced the pointing cracks away from the brick. The result is the same: water runs behind the flashing and down the upstand, and it appears as a stain on the ceiling inside the bay.

Where the upstand meets the side walls of the bay, the lead has to be turned and stepped, and this is another place for movement to bring a crack. The guide on step flashing and soakers explains how stepped lead is cut and chased, which is the same detail on a smaller scale.

Cutting a flashing into a wall that is shared with a neighbour is party structure work under the Party Wall etc. Act 1996, and the building owner gives notice at least two months before the date on which the proposed work will begin. A detached bay on your own wall does not raise the point, but a bay on a terrace or a semi can.

Where bay roofs leak

A bay roof leak starts at a joint, an edge or a corner, not at a hole in the middle of a sheet. The list below is what a survey works through, from the outside and from inside the bay, and several of the signs can be seen from the ground or from an upstairs window without leaving the safety of the house.

Inside, a stain on the ceiling of the bay, damp plaster on the soffit above the window or a swollen sill are all reasons to look at the roof. Outside, the front edge and the corners are the first places to check, since both stand out to the wind and either may have been patched before.

Send a photo of the bay on WhatsApp if you want a first look. One shot from straight in front and one from an upstairs window tells us whether the lead is cracked, lifted or stuck down with filler, and the roof still needs a survey in person before a price is written. The survey also takes in the window head below and the timber that carries the roof, because a repair to the lead alone cannot cure a fault in either.

Common leak points on a bay roof

  • Cracks at the hips and corner folds
  • Dropped pointing along the wall flashing
  • Lifted or pinned front drip edge
  • Mastic bead covering a failed joint
  • Ponding on a flat-topped bay
  • Blocked outlet or gutter at the front

The deck, the window head and the damp behind them

When water gets under the lead, it does not stop at the metal. It soaks the timber deck, runs along the rafters and drops where the roof meets the window head. By the time a stain shows inside, the boards may be soft and the timber over the window may be wet.

A relead that goes onto a damp deck seals the problem in. That is why the survey checks the timber before any lead is priced: poke the boards, look at the underside from inside the bay roof void where it can be reached, and check the window head for movement or rot. If the deck has gone, it is replaced first, and new lead goes on a sound base.

Dormers share this problem. The lead dormers guide covers cheeks, aprons and soakers, and a bay is the same family of detail turned the other way round: instead of a box standing on a slope, it is a box standing out from a wall.

None of this needs to be guessed. The whole roof is looked at, not only the bay you rang about, and what else we saw is told to you plainly. If the main slope above the bay has slipped tiles, they send water down onto the abutment and are worth knowing about at the same visit. A bay roof sits under the main roof's run-off, and a blocked gutter above it can overload the junction. That is the kind of finding the whole-roof look is for, and it is cheaper to deal with in one visit than to chase across two.

Myth

A bead of sealant along the bay roof joint is a proper repair.

Fact

Sealant hides a gap; the joint still needs lead or pointing.

Repair, relead or change the covering

A crack at one hip, a dropped flashing or a section of loose edge can be repaired, and a lead patch is a recognised repair where the sheet around it is sound. Repair makes sense when the deck is dry, the lead is of sound thickness and the fault is local. If the fault is at every corner, the lead is thin, or the deck is wet, a relead is the right size of job.

A relead strips the old covering, checks and repairs the deck, lays a new separating layer and dresses new lead to the same form. MyJobQuote says correctly installed lead flashing can last for over 80 years, and HomeBuilding gives a lead flat roof 60-100 years while Less says 50 to 100. These are published ranges for correct installation, not promises, and a bay's angles make correct dressing a test of the work.

If a bay is being changed to another covering, the lead flashing alternatives guide looks at the options. A listed building or a conservation area can limit what is allowed, so we confirm the route with the council before work starts. Replacing like for like is a different question from changing the shape or material of a visible bay.

The price follows the survey, as one written total, and published lead prices do not apply. The figures that exist cover chimney leadwork only. Access, the number of faces on the bay, the state of the deck and the wall flashing are what move the total. The lead roofing and leadwork page lists every lead guide in one place.

Questions and answers

Why does my bay window roof leak at the corners?

Corners are where lead is stretched when it is dressed round an angle, and where thermal movement concentrates. A crack at a fold lets water in, and filler over it makes the next crack come sooner. A survey looks at the lead, the deck below and the wall flashing together, so the repair deals with the cause and not only the crack that shows.

Can I seal a bay roof leak with mastic?

Mastic can hold for a short time, but it covers the gap instead of closing it, and it cracks as the lead moves. The repair is to rework the joint: new lead, new pointing in the wall chase or a proper cover flashing, with the deck checked underneath for damp before anything is laid over it.

Does a bay roof need to be releaded as a whole?

Not always. Where the deck is dry and the lead is sound, a local repair can be enough. If cracks sit at every corner, the lead has thinned or the boards are soft, a full relead is the better value. The survey settles which it is, with one written total for whichever it turns out to be.

Is leadwork on a bay a party wall matter?

It can be. Cutting a flashing into a wall shared with a neighbour is party structure work, and the building owner gives notice at least two months ahead. A bay against a wall that is wholly yours does not raise it, so check which wall the abutment sits against, and ask a party wall surveyor, not building control, if you are unsure.