Call 01493 277103

Lead roofing

Lead Codes Explained

Lead sheet is graded by a number from 3 to 8, and the number tells you how thick and heavy it is. This guide sets out each code with the figures a lead maker publishes, where each is used and who chooses.

Get a written quote

Call 01493 277103WhatsApp us

A glazed lean-to roof with dark aluminium bars on a rear extension

What a lead code is

Lead sheet for roofing is not sold by thickness in the way timber is sold by length. It is sold by code, a number that stands for a standard thickness and weight per square metre. A higher number means a thicker, heavier sheet. According to Leadworx, a maker of lead flashing, the codes come from the Lead Sheet Training Academy (the LSTA), and they meet BS EN 12588, the European standard for rolled lead sheet used in building.

There are six codes in everyday roofing use, running from 3 up to 8. Code 3 is the thinnest and lightest of the six and code 8 the thickest. Between them the codes cover everything from small hidden pieces that are easily dressed to heavy sheet laid across a large area.

The code is part of the specification for a roof, the written description of the materials and details. It is chosen for each detail, not once for the whole building, so a single roof can carry more than one code: a lighter code for pieces that are tucked away, a heavier one where the sheet has to span or stand up to more. Our guide to what lead flashing costs shows where the code fits among the things that set a price.

The six codes in Leadworx's table

The figures below are from Leadworx's published table. Weights differ a little between suppliers, which is why the maker is named here: take the numbers as Leadworx's, not as a universal figure. The last column gives the use Leadworx lists against each code.

Lead sheet codes 3 to 8 as published by Leadworx
CodeThicknessWeightLeadworx use
31.32 mm14.97 kg/m²Soakers, light duty
41.80 mm20.41 kg/m²Light duty, general
52.24 mm25.40 kg/m²General, vertical, pitched
62.65 mm30.10 kg/m²Large roofs
73.15 mm35.72 kg/m²Heavy duty
83.55 mm40.26 kg/m²Heavy duty

Reading across the table, each step up adds roughly half a millimetre or more of thickness and several kilograms per square metre. A square metre of code 8 weighs more than two and a half times what a square metre of code 3 does. The weight matters in handling, and it matters in cost, because the price of lead follows its weight.

Thickness and weight go together because lead is a dense metal: a sheet 1.80 mm thick weighs 20.41 kg for every square metre, and one 3.55 mm thick weighs 40.26 kg. That is why a roofer talks about codes rather than millimetres. A code carries both figures, and a lead merchant can supply it without any further description. If you see a number written as a weight, such as a figure in kilograms per square metre, it points to the same sheet as the code that carries that weight.

Code 4 and the idea of a standard

Leadworx says that "Code 4 has become the standard choice for general flashing work". That is the maker's observation about the trade, and it is worth keeping to that. The line belongs to Leadworx. Nobody is required to use code 4 for any flashing, and a particular roof can need something different.

What the sentence does tell you, as a reader of a quote, is that code 4 is a sensible reference point when you read a quote. If a quote specifies code 4 for flashings, it is in line with what a lead maker describes as the general choice. If it specifies code 3 for a flashing that stands exposed, or a heavier code for a small apron, the reason should be stated and make sense for the detail.

The specification gives a code for each detail, and that is the answer to the question of what lead grade is going on the roof. A fair answer names a code and the detail it is for, for example code 4 for the stepped flashing on a chimney stack or code 5 for a vertical face. An answer that names only "lead" leaves the thickness open, and a thinner sheet than the detail needs will split sooner than a correct one.

Myth

The law says lead flashing must be code 4.

Fact

Leadworx says code 4 has become the standard choice; no code is required for every flashing.

Where the lighter codes go

Codes 3 and 4 are the lighter end of the table. Leadworx puts soakers under code 3 along with light duty, and light duty and general work under code 4. A soaker is a small rectangle of lead bent into an L that sits under each course of slates or tiles along a wall abutment, a hidden piece that is easier to form from thin, soft sheet. Our guide to types of lead flashing shows where soakers sit among the other flashing pieces.

General flashing work, by Leadworx's reading, is where code 4 comes in: the aprons, covers and stepped pieces that seal a roof against a wall or a chimney. Thinner sheet is easier to dress, which means working it by hand into the shape of a joint, and it costs less in material.

A lighter code is not a mark of poor work in itself. The question is whether it suits the detail. Lead that is too thin for its position is more likely to crease as it is dressed, tear at a fixing or stretch as it warms and cools. That is where a roofer's judgement comes in, and it is one of the things a survey looks at on a roof that has had earlier repairs.

Where Leadworx places each code

  • Code 3: soakers and light duty
  • Code 4: light duty and general work
  • Code 5: general, vertical and pitched work
  • Code 6: large roofs
  • Codes 7 and 8: heavy duty

Where the heavier codes go

Code 5 is listed by Leadworx for general, vertical and pitched work, which covers vertical faces as well as pitched work. Code 6 is for large roofs, where a sheet spans a longer run and has to hold its shape. Codes 7 and 8 are listed as heavy duty.

A heavier code is stiffer and carries more weight over its whole area, so it is heavier to carry up a roof and takes more effort to dress. It is chosen when the detail calls for it, such as a large area of lead roofing or a position where the sheet has less support. It is not chosen as a general upgrade for a small flashing, where the extra thickness adds cost without adding much to the job. Heavier sheet also asks for a more careful fixing, because a thick sheet that expands and contracts with temperature pulls harder on its fixings than a thin one.

MyJobQuote's lead page says correctly installed lead flashing can last for over 80 years, and its page adds a parenthetical of "over 100 years for higher codes". That is the cost-guide source's wording and not a guarantee for any code or any roof. It does show that the code is one of the things that affects how long lead may last, and that a specification is worth reading for its code.

Asking for the code on your quote

The most useful thing a householder can do is ask for the code to be written on the quote, against each detail. That turns a vague "lead flashing" into something that can be checked and compared. If two quotes name different codes for the same flashing, the difference may account for part of the gap in price.

The questions are short. What code is each flashing, and why that one? Is the same code used for the soakers and the aprons, or are they different? And is the lead being fixed in a way that allows it to move? A flashing that is fixed too tightly can split however thick the sheet is, so the code is only half of the detail. The other half is the lap, the overlap between one piece of lead and the next, and the way each piece is held at its top edge. Both are part of the same specification, and a quote that gets the code right and the lap wrong has not solved the leak.

We survey the whole roof, then report plainly on what we found, including the condition of any existing lead, and the written quote names the work in one total price. Our guide to lead valley replacement shows how the same questions apply to a valley, where the sheet carries the run-off from two slopes.

Terms on a lead quote

  • CodeNumber grading sheet thickness and weight
  • SoakerSmall bent lead piece under each course
  • DressingWorking lead by hand into shape
  • SpecificationWritten list of materials and details

Where lead codes fit in the wider picture

A lead code is one of several choices on a lead job, alongside the type of flashing, the length, the fixing and the access. The lead roofing and leadwork hub brings together the guides on each. Codes are the part that is easiest to put into a number, which is why they get asked about, but a thick sheet laid badly does worse than a correct code laid well.

If a supplier's catalogue gives weights that differ slightly from the Leadworx table, the specification for your roof is the document that decides, and the quote should name the code it relies on.

Lead is also a material that changes with age. It forms a grey-white surface layer, called patina, that protects the metal beneath, so an old flashing that looks dull is not necessarily a failing one. What matters on an old piece is whether it is cracked, whether the lap is open and whether it has lifted at the edge. Those are checks made on the roof, and they can be put to you in plain terms, with a reason given for renewing a flashing instead of leaving it.

Lead also moves. It expands as the sun warms it and contracts as it cools, and a piece fixed too tightly will fatigue and crack where it is held. That movement is the reason long runs of lead are formed with joints that let the sheet slide, and it is a reason a flashing can fail while still being the right code. Our guide to types of lead flashing shows how the pieces are built up to allow for it.

Questions and answers

What lead code should I use for flashing?

The specification sets the code for each detail. Leadworx says code 4 has become the standard choice for general flashing work. It lists code 3 for soakers. A heavier code may be specified where a detail needs it. Ask for the code to be written against each flashing on the quote.

What is the difference between code 4 and code 5 lead?

In Leadworx's table, code 4 is 1.80 mm and 20.41 kg/m², listed for light duty and general work, while code 5 is 2.24 mm and 25.40 kg/m², listed for general, vertical and pitched work. Code 5 is thicker and heavier, so it is harder to carry and stiffer to dress.

Is code 4 lead the legal standard?

No. Leadworx says code 4 has become the standard choice for general flashing work, which is the maker's description of how the trade works. Nothing makes code 4 compulsory, and some details call for a different code. The Lead Sheet Training Academy sets the codes, and the specification for your roof sets which one goes where.

Does a higher lead code last longer?

MyJobQuote says correctly installed lead flashing can last for over 80 years, and adds "over 100 years for higher codes" in a parenthesis. That is a cost-guide's wording and not a promise for any roof. How the lead is fixed and formed is a separate check from the thickness of the sheet.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote