The short answer
Clear the loft, move vehicles and garden furniture away from the house walls, and tell your neighbours the scaffold is coming. Settle the covering and the written total before work begins, and keep anything fragile off the walls and ceilings below the roof.
The loft and the rooms beneath it
Start inside. When the old covering comes off, the underlay and battens beneath it are disturbed, and fine dust and grit work down through any gap in the ceiling below. Anything stored in the loft gets covered in it, so boxes, suitcases and old furniture are better lifted out beforehand or at the least pulled away from the eaves and wrapped.
Do the same with the rooms under the roof. Pictures, mirrors and shelves on top-floor walls can be shaken by the hammering overhead, so take down what you would hate to lose. Pull wardrobes and beds away from the outer walls and cover them, and if the top-floor ceiling has a crack or a loose patch of plaster, mention it to the roofer before the work starts, not after.
A water tank, loft wiring and insulation are all things the roofer has to work around. Tell the survey about stored items that cannot be moved, since a heavy chest of drawers affects how an area of rafters is reached. If the house has a loft hatch that is stiff or painted shut, free it now: it may be the only way in.
Cars, skips, scaffold and the neighbours
Scaffolding needs room all round the house, and a skip needs a place to stand. Move cars off the drive and away from the front of the house for the duration, and ask neighbours if their vehicles are parked close enough to catch falling debris. Where the scaffold would occupy the footway or part of the carriageway, that stretch of highway comes under the county council. We arrange the licence with our scaffolder.
Tell the neighbours early. They will hear the work and may see tiles being lowered over their boundary, and a short conversation avoids complaints. If they share a chimney breast with you, or the new roof meets their wall, the Party Wall etc. Act 1996 may apply. Serving that notice falls to the building owner, who gives at least two months before the party-structure work begins. The neighbour either agrees in writing or the surveyor procedure follows.
Satellite dishes and aerials on the roof or chimney may need taking down and refitting, which is a job for whoever installed them. Arrange that ahead of time, or you will have a roof ready and no television.
Order of preparation before the scaffold arrives
- Sign off the covering and the written price.
- Clear the loft and cover what must stay.
- Take down items on top-floor walls.
- Move cars, bins and garden furniture clear.
- Tell the neighbours and book the dish engineer.
The garden, pets and anything with a nest
Whatever is below the eaves takes the fall. Cut back or tie in climbers and cover delicate beds and shrubs close to the walls, and move pots, barbecues and garden furniture to the far side of the garden. Pets and young children should stay clear of the work area, so decide in advance where they will be during the day.
A roof can also hold wildlife. Birds and bats are protected by law. The Wildlife and Countryside Act 1981 makes it an offence to intentionally damage a nest in use or being built, and under the Habitats Regulations a bat roost may not be damaged or destroyed, intent or no intent. Where bats are involved, GOV.UK lists "repairing or replacing a roof" among licensable work from Natural England. If you have seen bats or birds using the roof or eaves, say so at the survey, and read the page on bats in the roof.
Gulls also nest on roofs, which can alter when a start is sensible. The gulls nesting on the roof page covers that, and the living in the house during a re-roof page answers the day-to-day questions.
Settling the paperwork before the first tile
Agree the covering and read the written price before work is booked. With us at Total Roofing Great Yarmouth the surveyor looks over every slope first, and what you are given is a single total. A guide on how to read a roofing quote lists what any quote ought to state, and the roof replacement hub explains the stages after that.
Signing at home after the survey opens a 14-day window in which you can cancel. Should you want the work to begin inside that window, put the request in writing; the window stays open regardless, and you may owe for whatever has been done by then. Urgent repairs that you telephone in for carry no such right.
Ask about the building control route too. Stripping the whole roof falls outside the Planning Portal's 25 per cent and 50 per cent test, so the council's building control team or a registered approver is consulted, and the council or the Broads Authority where planning could apply. We check that route before work starts, which spares you one chase once the scaffold is up.