A quote describes a job
A homeowner can end up holding two quotes and looking only at the two totals at the bottom. The totals are the least informative part of either document. A quote for "roof repair" at one figure and a quote for "roof repair" at another can describe different jobs, one patching three tiles and the other stripping a slope, and nothing in the totals reveals which is which.
So read from the top. A quote worth having starts with who is offering the work and how to reach them, then names the address, then describes what will be done to which part of the roof, then gives the total. If the description is missing or vague, the total cannot be tested against anything, and you have nothing to hold a firm to if the job turns out different.
On our own jobs the survey comes first and covers the whole roof, parts you did not ring about included. The written quote comes after the survey and gives one total price, which is good and fair for the work described. A quote written before anyone has been up to look is a guess, whatever it is called.
Our guide on building control for roof work explains why the extent of the work matters to the paperwork, and that is one more reason a quote should say which slopes are included. If you would like to see everything the firm does, start from the Total Roofing Great Yarmouth home page.
What the page should say
Think of a quote as answering six questions. Who is the firm, what is the work, what material goes on, how does the crew reach the roof, what happens to the old material, and how and when does payment fall due. A quote that answers all six leaves little room for argument later. A quote that skips three of them leaves a great deal.
| Part | What to look for |
|---|---|
| The firm | A name, an address for letters and a phone number |
| The scope | Which slopes, ridges, valleys, chimneys and gutters are covered |
| The covering | The tile, slate or membrane named by type and make |
| Access | How the roof is reached, and whether scaffold is part of the price |
| Waste | Where the old covering goes and who carries it |
| Payment | The amounts, the stages and the dates |
The access row deserves a second look when you are reading another firm's quote. Scaffold can be a large part of a roof job, so check whether the total covers it or whether it will arrive as a separate bill. Our own guide to scaffolding for roof work explains why it is needed and who arranges the licence.
The waste row matters too. A firm that carries waste away is registered as a waste carrier, upper tier or lower tier, and a quote that says nothing about the old material leaves you wondering who will do it. If the roof was built or refurbished before 2000, HSE says to presume asbestos is there, so ask what the plan is before any sheet or soffit is touched.
One total price, and what sits behind it
Our quote is one total price. It is not a menu of separate figures to add up, and it is not a starting figure that grows. The description of the work sits beside the total, and the total is for that work.
Why one figure? Because a roof job is one job. The covering, the access, the timber that needs replacing and the waste all depend on one another, and the cost of any of them cannot be fixed until the roof has been looked at. A number given from the pavement cannot be fair in the same way.
Published price bands help you judge if a total sits in the right region, as long as the unit and the source are kept with the figure. The bands below come from three named sources, each with its own date. They describe average jobs, and your roof is not an average.
A per-square-metre price is a unit, not a total. Never multiply one by the area of your roof and treat the answer as a quote, because the multiplication leaves out everything that makes your roof different. The sources above are a guide, and the written quote is the figure that counts.
Published price bands
| Replacing the whole roof | £7,000 to £21,000 for an average three-bedroom house |
|---|---|
| A new roof, UK figure | an average of around £5,250 |
| Replacing one to six standard tiles | £75 to £400 |
| Average roof repair in 2026 | around £650 |
Sources: Which? Trusted Traders, November 2025, a survey of 11 traders, for an average three-bedroom house, excluding VAT. MyJobQuote, new roof page of 3 November 2026 and roof maintenance page of 6 October 2026.
Comparing two quotes fairly
Put the two quotes side by side and compare the descriptions before the totals. Do both quotes cover the same slopes? Do they name the same kind of covering? Is access treated the same way, and is waste dealt with in both? If the answer to any of these is no, the two totals are for different jobs, and the gap between them is explained by the work, not by one firm being cheaper or dearer.
A gap that the descriptions cannot explain is the thing to ask about. Ring the firm with the lower total and ask what it has left out, or ring the firm with the higher total and ask what it has put in. A good firm can answer in a sentence, and a firm that cannot is telling you something.
Check the covering by name. "Tiles" covers a wide range of products with different lives and weights, and Marley says typically roof tiles are expected to last for around 60 years but adds that it is no guarantee or warranty of its longevity. The make and type on the quote tell you what is actually going on the roof.
Do not choose on the total alone, and do not choose on the description alone either. The test is whether the total, the description and the survey fit together, and whether the firm behaves like one that expects to be held to what it wrote. Write down the answers you are given, and ask each firm the same questions in the same order, so that the replies can be set side by side afterwards.
Comparing two quotes
- Check both cover the same slopes and features.
- Check both name the same type of covering.
- Check how access and waste are treated.
- Ask about any difference the wording cannot explain.
- Only then compare the two totals.
Questions to ask before you choose a roofer
What should you check before choosing a roofer in Great Yarmouth? Start with what the quote says, then ask the questions it does not answer. A roofer who has surveyed the roof can answer all of the questions in the list below on the spot, and one who cannot may not have looked closely.
Ask about the quote itself: how long it stays open, what happens if the survey of the covering underneath finds rotten battens or damaged timber, and how any change would be put to you before it is done. A firm that has thought about those cases will have an answer ready, and the answer should match what the written quote already says.
Ask which consents the job might need, and who is checking the route. A roof job may need building control, planning permission or listed building consent, and in the Broads the Broads Authority decides planning. Our planning guide sets out the questions, and a firm that has not thought about them is a firm to question further.
Ask how the roof is being reached, and whether a scaffold licence is needed on your street. The answer should be specific to your address. Ask what happens if the survey finds something extra once the covering is off, and how that would be put to you in writing before it is done. Ask the firm for the name of a person at the end of the phone. A roofer who works from a van and leaves no contact is a poor bet whatever the price.
Questions to put to any roofer
- Who is the firm, and how do I contact it?
- Which slopes and features does the price cover?
- Which covering is going on, by name and make?
- How is the roof reached, and is a licence needed?
- Where does the old material go?
- What would change the price, and how is it agreed?
Signing, paying and your rights
Inside 14 days you can cancel a contract made at home after a survey. Under the Consumer Contracts Regulations the cancellation period ends at the end of 14 days after the day on which the contract is entered into. Work starts earlier only on a written request from you, and that request leaves the 14 days intact; payment for work carried out in the meantime can fall due.
There is one exception. Where you have specifically requested a visit from the trader for the purpose of carrying out urgent repairs or maintenance, there is no cancellation right. A leak at night that you phone about is a visit you asked for, and it falls under that exception.
The Consumer Rights Act 2015 adds that a service has to be performed with reasonable care and skill. If a job goes wrong, put it to the firm in writing and keep the photographs. The Citizens Advice consumer helpline, 0808 223 1133, gives advice on a dispute, and Trading Standards gives no direct advice to individuals.
Payment stages belong in the quote. A stage payment tied to progress on the roof is a fair arrangement, and a demand for the whole sum in advance is worth questioning. Keep every payment on paper, whatever the method. A receipt for each payment, with the date and the amount, is worth asking for whatever the method, because it ties the money to the stage of the work.