Two layers of control on one roof
Listing is a national designation. It protects a building as a whole, outside and in, and the roof is part of what is protected. A listed home therefore has the usual controls that any house has, and one extra: listed building consent. The extra layer does not replace the others. Planning, Building Regulations and listed building consent are three separate questions, and one job can raise all three.
Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 sets the test for the extra layer. Consent is needed for works to a listed building "in any manner which would affect its character as a building of special architectural or historic interest". The test is about character, not about how big the job is. A small change in the wrong place can need consent, and a larger one that leaves the character untouched may not.
Who decides whether a particular job affects character is the local planning authority, and the sensible time to ask is before the work is planned, not after the scaffold is up. For most of the Great Yarmouth area that is the borough council or the district council for the address, and inside the Broads executive area it is the Broads Authority. When Total Roofing Great Yarmouth surveys a listed roof, we confirm the route with the council before work starts, which settles the question early.
Our guide to planning permission for roof work covers the permitted development classes themselves, and this page covers what changes when the house is listed.
Classes B and C still apply, with consent beside them
A common belief is that listing switches off permitted development altogether. The General Permitted Development Order does not say so. Neither Class B, which covers roof enlargements, nor Class C, which covers re-roofing and roof lights, excludes a listed building. Listed homes keep their permitted development rights for roof work, but listed building consent is needed for anything that affects the building's character.
That produces two sets of tests running side by side. Planning permission may not be needed because Class C allows the work, while consent is still needed where the work touches the building's character. The reverse also happens: a job can need no consent and still fall outside the classes for another reason, such as an Article 4 direction or a flat.
| Question | Answer comes from |
|---|---|
| Does planning permission apply? | Classes B and C, Article 4, flats |
| Does the work affect character? | The council, under section 7 of the 1990 Act |
| Do Building Regulations apply? | Building control, on the scale and weight of the work |
There is also a point on dormers. Class B roof enlargements are not permitted development on article 2(3) land, which takes in the Broads and conservation areas, and a listed building inside either needs permission as well as consent. Neither layer can stand in for the other.
What a conservation area adds is covered in the planning guide. The listed layer described here is consent under the 1990 Act, and it applies whether or not the house stands in a conservation area.
Myth
Listed homes lose their permitted development rights for roofs.
Fact
They keep Classes B and C, and need listed building consent as well.
What touches the character of a roof
Character is judged from the detail. On a roof it can include the covering, the way it is laid, the ridge, the verges, the chimneys, the rainwater goods and any opening in the slope. A new roof light is a change to the slope. A different tile or slate changes the texture and colour of the whole roof. The loss of an old chimney changes the skyline.
A repair that puts back what was there, in the same material and laid the same way, is the kind of work that touches character least. Whether it needs consent is still the council's decision, and a written answer is worth having before the work starts. A repair that substitutes a different covering is a change, even if it is cheaper or lighter.
Old roofs also hold surprises. Lead is one: MyJobQuote says correctly installed lead flashing can last for over 80 years, so old leadwork on a listed home can be original fabric, and replacing it is a conversation with the council, not just a purchase. Timbers hidden under the covering can only be judged once it is lifted, and every slope gets looked at, so the findings can be set out in plain terms before a written price is given.
Photographs help the council, and a photograph sent on WhatsApp lets us give a roof a first look before a visit.
Work that can touch character
- A new or different covering
- A new roof light in any slope
- Changes to a ridge, hip or verge
- Taking down or reshaping a chimney
- Replacing old leadwork
- Swapping rainwater goods for another material
Churches and the ecclesiastical exemption
Churches are the exception to the listed building consent rule. Section 60 of the 1990 Act says the controls do not apply to an ecclesiastical building which is for the time being used for ecclesiastical purposes. What replaces consent depends on the denomination, because the Ecclesiastical Exemption (Listed Buildings and Conservation Areas) (England) Order 2010 keeps the exemption only for some.
The exemption replaces listed building consent only, and planning permission still applies to exterior work where it is needed, so it is wrong to say that the council has no say. The route for each kind of building is in the table.
| Building | Route |
|---|---|
| Church of England church in use | The faculty system |
| Roman Catholic church in use | The Catholic Church's own system |
| Methodist or United Reformed church that is in use | The denomination's own system |
| Baptist chapel in use | Exempt only through a Schedule 1 trust corporation in the Baptist Union |
| Unitarian, Quaker and other faiths | Listed building consent |
| Redundant church or Churches Conservation Trust | Listed building consent |
A minister's house is not an ecclesiastical building under section 60(3), so it needs listed building consent in the ordinary way. A church hall or a chapel no longer used for worship needs the same.
Great Yarmouth Minster, Norwich and scheduled monuments
Great Yarmouth Minster is the local example. The Diocese of Norwich says that on 9 December 2011 the Bishop designated St Nicholas Church a Minster Church, and that it is the largest parish church in the country. It is still a Church of England parish church, so a Church of England church in use, including Great Yarmouth Minster, goes through the faculty system rather than listed building consent. The Minster title is a designation by the bishop, and it does not make the church a cathedral. The church was gutted in 1942 and reconsecrated in 1961.
Norwich has two cathedrals and they follow different routes. Work to Norwich Cathedral goes through the Church of England's Care of Cathedrals Measure, not the parish faculty system. St John the Baptist is the Roman Catholic cathedral, and a Roman Catholic church in use follows the Catholic Church's own system.
A scheduled monument is a different kind of protection again. Works to one must be authorised under section 2 of the Ancient Monuments and Archaeological Areas Act 1979. It is the Secretary of State who grants consent; applications are sent to Historic England, so asking the council is the wrong first call.
For a Church of England church in use the faculty jurisdiction decides the route, so the roofer is booked only after that route is clear.
Bats, birds and old roof spaces
Older roofs can hold wildlife, and the law covers it whatever the building's status. GOV.UK states: "All bat species, their breeding sites and resting places are fully protected by law". Its bat guidance names "repairing or replacing a roof" as one of the works that can need a Natural England licence. Damaging or destroying a bat roost is an offence whatever the intent, as is blocking access to a place a bat uses for shelter when done "intentionally or recklessly".
Birds are treated differently. The Wildlife and Countryside Act 1981 makes a person guilty of an offence who intentionally "takes, damages or destroys the nest of any wild bird while that nest is in use or being built". An empty nest from a past year is outside that wording, and an active one is not. No calendar dates are laid down: the test is whether the nest is in use or being built, so a survey on the day of the work is what settles it. Gaps under slates, soffit boxes and chimney tops can all hold a nest.
A listed roof adds a further wrinkle. If bats are found, the licence conditions and the consent conditions both have to be met, and the order in which they are handled can set the programme. We look in the roof space as well as at the covering, and anything seen there is flagged before any price is written, so the written total reflects the real job.
Before you ask for a price
Settle the status of the building first. Historic England keeps the National Heritage List for England, and a listing there gives the grade and the extent of what is protected. A conservation area, an Article 4 direction and a flat are separate checks, and each is a question for the council.
Then ask the council, in writing, whether the planned work affects character. Describe the covering, the slopes and any new openings. A written answer is the one to keep, because it can be shown to anyone who prices the work, and quotes can then be compared on the same footing. Our guide to reading a roofing quote covers what a quote should state. Keep every reply with the quote that follows it. If a council says that a particular covering is acceptable, that answer belongs with the written price, because the price is for work that has been agreed, and the next firm asked to quote sees the same facts.
Finally, check whether the covering or the structure changes in a way that brings in building control. Our building control guide sets out the tests. A listed building gets no exemption from Building Regulations, and the two systems are applied together.
On a listed roof the wording of a quote matters a great deal. A written quote that names the covering, ridge, leadwork and any new opening gives the council something precise to respond to, and it gives you one total price to weigh against the consent timetable. If a quote only says repair roof, the work it describes cannot be matched to anything the council has agreed, and the roof ends up decided on the day.
Order of checks for a listed roof
- Confirm the listing, the grade and what it covers.
- Check conservation area and Article 4 status with the council.
- Ask the council in writing if the work affects character.
- Check the Building Regulations route for the same work.
- Ask for a written quote based on the answers.