What BS 5534 is, and which edition is current
BS 5534 is the British Standard code of practice for slating and tiling of pitched roofs and vertical cladding. It sets out how a roof covering of tiles or slates is laid and, above all, how it is held on. It is written for the people who design and fit roofs, and it deals with things a householder does not see from the ground: the fixing of every tile, the securing of ridges, hips and verges, and the wind loads the roof has to resist.
The current edition is BS 5534:2014+A2:2018. BSI lists it as current and says it supersedes BS 5534:2014+A1:2015, which is withdrawn. So when a quote or a data sheet refers to BS 5534, the question to ask is which edition it means, and whether the fixings described match the one in force. An older roof may have been laid under an earlier version of the rules, and a repair is made to the standard as it now stands, not as it did when the roof was built.
The standard is a code of practice, which means it describes good practice rather than imposing a legal duty. Roofing guides in this series that touch on the code, such as our plain tile roofs guide, point back to the pitched roofing hub where the full set is listed.
Not law, but the standard of good work
Marley, a tile maker, is direct about the legal position: installing to BS 5534 isn't required by law. A householder cannot point to a statute that says a roof must be fixed to it, and a contractor who ignores it has not broken an Act of Parliament by doing so. The question is one of quality and of what can be defended later, not of a fine.
That is only half the picture. Building control looks at whether a roof meets the Building Regulations, and the standard is the recognised way of showing that the covering is fixed well enough to stay on. Insurers, surveyors and later buyers' surveyors judge a roof against it. A roof laid to a method the standard does not support may pass a casual glance and then be queried years later. Fixing to the code is therefore the sensible course, even though the law does not compel it, and it is the course a careful roofer follows without being asked.
So the position is simple to state. BS 5534 is not law, but it is the code of practice that tile fixing is specified under, and a fixing specification written under it is the proper basis for a quote. A roofer who says that the code is optional, and therefore skips it, is describing the legal position accurately and the likely quality of the work badly. The right reply to that remark is to ask how the covering will be fixed instead.
Myth
A fixing standard only matters if the law demands it.
Fact
Marley says installing to BS 5534 isn't required by law; it is the standard of good practice.
Mortar and the 2015 amendments
For a long time, a lot of tiled roofs were held on with mortar. Ridge tiles were bedded in it, verge tiles were set in it and the ends of tile courses were sealed with it. The 2015 amendments changed the position. Marley says they made it clear that mortar could no longer be relied upon as the sole means of fixing the roof covering.
Read that line carefully. It does not rule mortar out, and it does not say mortar has no place. Mortar can still bed a ridge or finish an edge. What changed is that mortar cannot be the only thing holding the covering. A mechanical fixing, a nail, a clip or a fixing unit made for the job, has to do the holding, and the mortar is then a finish. On older roofs this means a ridge, hip or verge held by mortar alone is a point for the survey even where the mortar looks sound.
On ridges and hips, Marley's wind-resistance guidance is that tiles should be mechanically fixed, in every case, so that they resist the calculated uplift force. Our dry verge systems guide covers the matching question at the gable edge, where a dry-fixed system is the mechanical alternative to a mortar bed.
The fixing specification for your site
The minimums in BS 5534 are a starting point. Marley says they will always be superseded by a Fixing Specification, which is site specific and takes into account factors such as location, with the question: how exposed is the roof, and what is the local topography. In other words, there is no one fixing pattern for every roof in the country. The specification is worked out for the roof in front of you.
That is where exposure comes in. A roof on open ground, a roof at the top of a rise and a roof sheltered by neighbouring buildings are three different cases, even when the tiles are identical. The wind load on each differs, and so does the fixing needed. Marley adds that when considering the wind loading on the roof covering, designers should consult BS 5534, and the code is the reference the specification is built on. Anything the specification adds sits on top of that reference, never below it.
For this reason a quote should say what will be fixed and how. If a figure is written in, ask what it assumed about the site. Where the roof was measured and the exposure was considered, the answer is easy to give. Where the price came from a quick look at the street, it may not be.
How a fixing specification is built
- Identify the tile and the roof pitch
- Assess how exposed the site is
- Choose the nail, clip or screw for every part
- Specify mechanical fixing for the ridge, hips and verge
- Write the specification into the quote
Nails, clips and what holds a tile on
Three things work together to hold a roof tile: its own weight and lap, a nail or clip into the batten, and the batten fixed to the rafters. Take away the middle one and the tile is only resting in place. That is why loose fixings are weighed alongside cracked tiles when a roof is checked: a cracked tile lets in water, but a tile with nothing holding it can leave the roof altogether in a gale.
Which tiles are fixed, and with which fixing, depends on the tile type and the specification. Interlocking concrete tiles, plain tiles and pantiles each have their own rules, and a maker's data sheet states them. Our concrete interlocking tiles guide covers the clip and nail side for that family. Whatever the tile, the check is the same: is each tile held at the points the specification names, and is the batten behind it sound?
Nails and clips can be wrong in quiet ways. A nail may have been driven into a split batten, a clip may have been left off a run of tiles, or old nails may have worked loose with the movement of the roof over many years. None of this is visible from the ground, and a survey that lifts a few tiles at test points shows what is going on beneath.
What is checked on a fixed tile
- Nail or clip present at each required point
- Batten sound where the fixing goes in
- Ridge and hip tiles mechanically fixed
- Verge edge held by more than mortar
- Tile lap and gauge as the maker states
Coastal and inland roofs: one question, exposure
Around Great Yarmouth the roofing question is not whether a roof is coastal or inland but how exposed the particular site is, and the standard handles both the same way. Both Gorleston-on-Sea, 3.7 road miles from Great Yarmouth to the south, and Caister-on-Sea, 3.4 road miles to the north, are coastal towns. On their roofs, as on a roof at Bradwell, 4 road miles south, fixings are worked out for the site's exposure under BS 5534.
No wind speed, zone or distance-from-the-sea rule is applied in this guide, because none is needed to make the point: the specification looks at the roof as it stands. A roof near the coast is not automatically treated differently from one inland, and an inland roof in an open position is not automatically treated as sheltered. The site decides.
So the materials for any property, coastal or not, are chosen from what its pitch, its structure and its exposure allow, and then fixed to the specification. Our guides on plain tile roofs and on concrete tiles list the minimum pitches that narrow the choice, and the survey measures the roof before a tile is named. If you are comparing two quotes, compare what each says about fixing, since two roofs that look identical in a photo can be fixed very differently.
What to ask a roofer about fixing
When a roofer prices a re-roof or a repair, a few questions bring the fixing out into the open, and the answers are worth having in writing before you agree anything. Ask which edition of BS 5534 the work follows, how the fixing specification was arrived at for your roof, and how the ridge, hips and verges will be held. A clear answer to each is a good sign, and it should name the parts: nails, clips, fixing units and the tiles they apply to. A vague one, or a reply that the roof will just be done as usual, is worth a second look.
A re-roof also touches regulation. Under the Planning Portal's guide, re-roofing does not normally need a building regulations application if it affects "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof is affected." A whole-roof re-cover is over the second limit, and a covering that is "15 per cent or more" heavier needs approval. On a Great Yarmouth address, check with the borough council's building control team.
The survey for a re-roof looks at the whole roof. What it finds, including anything else seen, is explained in plain words, and the one written total price follows. You can send photos on WhatsApp ahead of that if you want a first view of what fixing the roof may need, and the phone and quote form are on every page too.