Call 01493 277103

Lead roofing

How Heavy Is Roofing Lead?

Lead is sold by code, and each code stands for a thickness and a weight per square metre. Here are the figures Leadworx publishes and what they mean for a roof.

Get a written quote

Call 01493 277103WhatsApp us

A dormer with new lead-clad cheeks and roof on a clay tile roof

The short answer

Lead sheet weighs from 14.97 kg per square metre for code 3 up to 40.26 kg for code 8, according to Leadworx's table. Thickness runs from 1.32 mm to 3.55 mm across the same codes. The weight varies between suppliers, so these are one maker's published figures.

Weight by code in one table

Lead sheet is dense, so a thin sheet is already heavy. Nobody buys it by thickness alone: it is ordered by code, a number from 3 to 8, and each code has a standard thickness and a weight for every square metre. The figures below are from Leadworx, a lead flashing maker, and they are named because weights differ a little from one supplier to the next.

Lead sheet codes, thickness and weight (Leadworx)
CodeThicknessWeightUse listed
31.32 mm14.97 kg/m²Soakers, light duty
41.80 mm20.41 kg/m²Light duty, general
52.24 mm25.40 kg/m²General, vertical, pitched
62.65 mm30.10 kg/m²Large roofs
73.15 mm35.72 kg/m²Heavy duty
83.55 mm40.26 kg/m²Heavy duty

Leadworx adds that BS EN 12588 is met by these codes, which are the Academy's own. Our fuller guide to lead codes explained goes through where each one is used.

Why the weight matters

A heavier code is a thicker sheet, so it resists tearing and can take more handling on a roof, but it is also harder to dress into a tight fold. A light code folds easily and suits small pieces such as soakers, the small slips of lead laid with each slate or tile course. A heavy code suits a long run, a large flat or a place where the sheet is exposed.

The weight is also what you pay for. Lead is priced by weight, which is why a step up in code adds cost across a roof, and why the lead is one of the larger items on a leadwork job. Leadworx says code 4 has become the standard choice for general flashing work, and the specification sets which code goes where, so a flashing round a chimney and a valley on the same roof can be different codes.

One more point about weight: a lead roof carries the metal's own load on the structure beneath it. The Planning Portal puts the line for Building Regulations approval at a new covering "15 per cent or more" heavier, and suggests a structural engineer or surveyor check first. Approved Document A treats a roof load increased by more than 15% as a significant change.

Reading a weight on a quote or an invoice

If a quote gives a code, you can turn it into a weight with the table. If it gives only a weight, for example 20.41 kg per square metre, that is code 4 in Leadworx's table. Ask which supplier's table the figure comes from, since weights differ between suppliers.

A written quote that names a code for a flashing and a different one for a flat roof is describing sensible practice, not a mistake. It means the roof has been looked at detail by detail. A quote that names no code at all leaves the thickness unsaid, and it is fair to ask for it to be stated. The same goes for the width of the pieces: a code on its own describes the sheet, and the layout of the roof decides how much of it is needed. Weight is only one half of the picture, and a quote that gives a code and a total together lets you check the two against each other, with the written total as the price you are asked to agree.

We give one written total for the work after surveying the roof, and the code sits inside that. Our page on what lead code for flashing goes through the choice for flashings, and the lead roofing and leadwork hub lists the rest.

How the weight shows up in handling

Leadworx gives code 8 as 40.26 kg per m² and code 3 as 14.97 kg, so the heavy sheet is well over double the light one. On the roof that gap is felt in carrying, lifting and dressing. A heavy roll is awkward to haul up a ladder and awkward to hold in position while it is folded, which is one reason lead work is not a casual job. Lead is also a toxic metal, so a cut sheet is handled with care and the hands are washed before eating or smoking. The weight is another reason the supports under it matter: a lead flat roof or a long valley rests on boards that have to be sound, and a flashing hangs from a wall that has to hold it. Our page on replacing lead flashing yourself covers the risks. Old lead stripped from a roof is heavy as well, so the weight of a job is more than the weight of the new sheet.

Questions and answers

Is thicker lead always better?

No. A thicker code resists tearing but is harder to fold, so on a small awkward detail it can be the wrong choice. The code is set for each detail by the specification, and a roof can carry several codes at once. The right one is the one that suits the detail.

How heavy is a sheet of lead?

Leadworx's table gives 20.41 kg per square metre for code 4 and 25.40 kg for code 5, so a sheet one metre by three weighs well over 60 kg in code 4. Sheets are cut for the job, and the weight on a roof is the metal laid, not the roll.

Does lead weight change the roof's structure rules?

The Planning Portal's test is about the new covering as a whole: Building Regulations approval is needed once the new covering reaches the 15 per cent or more line. The test names no material. If your roof is changing covering, ask building control or a structural engineer rather than working from lead's weight alone.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote