The short answer
Yes, wherever a flashing's lower edge would otherwise hang free. A clip holds that edge down against the covering so wind cannot lift it, while the lead can still move as it warms and cools. How many are needed, and how far apart, is for the roof's specification and exposure to settle.
What a clip is and what it holds
A lead flashing is held at the top, where it is turned into a chase or fixed to a wall. The lower edge rests on the tiles or slates, and nothing but its own weight keeps it there. Lead is heavy, but a gust can still get under a free edge, so the lower edge is gripped at intervals by a clip.
A clip is a small strip of lead or stainless steel, fixed to the roof structure or covering beneath the flashing and folded over the edge of the sheet. It holds the edge down without a nail through the lead, which matters because a nail would pin the sheet in one place and tear it when it moved. The clip lets the sheet slide a little under the fold while keeping the edge from rising.
For the upper edge, see our page on how lead is chased into a wall.
Why exposure decides how many
Marley, a tile maker, says the minimums in BS 5534 give way to a fixing specification worked out for the site, and exposure is among the factors it takes in. That advice concerns tiles, and it is a fair way to think about lead too. A roof on open ground, or standing high above its surroundings, has to resist more than one tucked in among others.
A spacing borrowed from another site fits that site, whereas the spacing for your roof is set from the length of the run, the exposure and the code of the lead. Leadworx puts lead sheet codes at 3 to 8 under BS EN 12588, with the code for each detail chosen in the specification. The clips are written into that specification too.
Ask for the clip arrangement to be written into the specification before work starts, so you can see what each part of the flashing is held by.
Clips and the rest of the fixing
Clips are one part of a set. They are fixed where the roof timbers or the boards can take them, so the condition of the structure beneath matters to how well they hold. The flashing also needs a sound top edge, since the clips only hold the lower edge, laps wide enough to shed water, and a covering beneath that lies flat. Without these, a clip holds down an edge that is already letting water in.
- Top edge turned into the wall and pointed
- Lead cut in lengths that can move without tearing
- Laps between lengths that shed water
- Clips along the lower edge, as the specification sets
- A flat covering underneath, with no slipped tile
What clips cannot do is stop a flashing that was cut too long from splitting, or hold a sheet to a wall whose pointing has fallen out. When we look at a flashing, the clips are checked alongside those other points, and what we find is described to you in ordinary language, including any other fault in the same run of lead. A flashing that has lost one clip may have lost its neighbours' grip as well, and a lift that begins at a corner can run along the whole edge, which is why the full length of the edge is looked at.
Signs that clips have failed
A missing or failed clip shows as a lower edge standing off the tiles, a corner curled upward, or a flashing that rattles in a gust. A strip of daylight under the edge is a sign, and so is a line of dirt or moss pushed up beside it.
Lead flashing lifted by wind covers what to do once the edge has come up. A repair can mean refixing clips along a sound sheet, or replacing a length of lead that has been bent and torn. In its June 2026 table, Checkatrade gives lead flashing repairs as £50 to £70 per metre, exclusive of VAT, though a rate for a length is not the price of a job. The lead roofing and leadwork hub lists the other lead details.
Because clips are out of sight beneath the fold, a check from the ground can miss them. The flashing is looked at close to, and a photograph sent to WhatsApp on 07880 284133 is a first step that keeps your feet on the ground.