Call 01493 277103

Lead roofing

How Lead Is Chased Into a Wall

Where a roof slope meets a wall, the lead has to be held at the top edge. A chase is the groove that holds it. This page covers how it is cut, fixed and sealed.

Get a written quote

Call 01493 277103WhatsApp us

A glazed lean-to roof with dark aluminium bars on a rear extension

The short answer

A chase is a groove cut into the wall along a mortar joint, so the top edge of a lead flashing can be tucked in, wedged and pointed. It holds the lead against the brickwork without leaning on sealant. On a shared wall, cutting it can bring in the Party Wall etc. Act 1996.

What a chase does for a flashing

Flashing means the strip of lead bridging the gap where a roof slope runs up against a wall. The lower part lies over the tiles or slates and the upper part has to stay tight against the masonry, or rain runs in behind it. Gluing the top edge to the face of the wall relies on a bead of sealant that sun and frost will work loose. A chase gives the lead a mechanical grip instead.

The chase is a narrow groove, cut with a grinder or a hand tool, and the top edge of the lead is turned into it. Because lead is soft and heavy it will not hold that shape by itself, so small folded lead wedges are driven in to pin it, and the groove is filled over the top. The result is a flashing whose upper edge is buried in the wall, with nothing exposed on the face except a line of pointing.

MyJobQuote says correctly installed lead flashing can last for over 80 years, and a well made chase is one of the details that word correctly has to cover. Our guide to the types of lead flashing shows where a chased edge is used and where another fixing is chosen, and the lead roofing and leadwork hub gathers every other lead page.

From groove to pointing, step by step

The order matters, because each stage depends on the one before it. This is how a chased flashing is built up on a wall that is sound enough to take it.

  1. The line is marked on the wall, set so the lead will overlap the covering below it by a proper margin.
  2. The groove is cut, along a bed joint of the brickwork so the bricks themselves are left whole, and the loose mortar is cleared out of it.
  3. The lead is dressed over the covering and its top edge is turned into the groove.
  4. Lead wedges are driven in at intervals to pin the edge, with the spacing judged from how long the run is and how exposed the wall stands.
  5. The groove is pointed with mortar, or filled with a sealant where the specification allows it, and the surface is tooled flush.

The depth of the groove, the lead code and the type of pointing are set by the specification for the roof. Leadworx, which makes flashing, grades lead sheet by code from 3 to 8 under BS EN 12588, and says that code 4 has become the standard choice for general flashing work, but the specification sets the code for each detail.

When the wall is shared with a neighbour

In a semi or a terrace, the wall a flashing is cut into can be a party wall. The Party Wall etc. Act 1996 section 2(2)(j) lets a building owner use the right "to cut into the wall of an adjoining owner's building in order to insert a flashing or other weather-proofing". It counts as party structure work, so the notice rules for that kind of work apply.

The owner of the building gives the notice, and the Act wants it "at least two months before the date on which the proposed work will begin". A neighbour may consent in writing to work beginning sooner. A surveyor comes in only where the neighbour objects, or stays silent "within the period of fourteen days"; objection leads to the section 10 procedure, not a veto. A party wall surveyor, not building control, is who answers shared-wall questions.

If your flashing runs along a shared wall, tell us at the survey so that point is raised before a date is set.

What goes wrong at a chase

The chase is a joint between lead and masonry, and each side can fail. The pointing can crack or fall out, which leaves the wedges and the edge of the lead open to rain. The wedges can be missing or too few, so the lead sags out of the groove and hangs loose. A groove cut in the wrong place can split a brick, and one cut too wide leaves a gap that mortar does not fill well.

Water that gets behind the lead does not always show on the ceiling straight away. It can run down inside the wall first, so a damp patch on a bedroom wall beside the roofline can come from a failed chase some way above it. The survey looks at the lead, the pointing and the brickwork together, because a repair to one without the others can leave the leak in place.

For flashing repairs, Checkatrade's June 2026 table puts lead flashing repairs at £50 to £70 per metre, exclusive of VAT. That rate covers a length of lead, not a whole job. What we quote you is one written total price after the survey.

Questions and answers

Can a flashing be fixed without cutting a chase?

Yes. A flashing can be fixed to the face of the wall with a surface fixing and a sealed top edge instead. That keeps the brickwork whole, but the sealant then does much of the work a chase does with its wedges and pointing. Which method suits a wall depends on its condition, and the survey decides.

Is a chase cut into the brick or the mortar?

It is cut along a mortar joint where the wall allows, so the bricks are left whole and the pointing can be renewed later without touching them. If the joints are too far from the line the lead has to follow, the chase is cut to suit the wall and the specification.

Do I need a party wall notice for a flashing on a shared wall?

Cutting a flashing into a party wall is party structure work, and the building owner serves a notice that must give at least two months of warning. If you are unsure whether a wall is shared, a party wall surveyor can tell you. A neighbour can consent in writing to an earlier start.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote