The short answer
Ask the council first. A conservation area can carry extra controls, an Article 4 direction can withdraw further permitted development rights, and re-roofing rights do not cover altering a chimney. Removing a chimney breast also always needs Building Regulations approval, whatever the planning answer is.
The planning question comes first
Householder permitted development lets some work to a house go ahead without a planning application, and the class that covers alterations to a roof includes re-roofing. That class has limits, and one of them reads straight across to chimneys: it excludes the installation, alteration or replacement of a chimney, flue or soil and vent pipe. So taking a stack down is not covered by the re-roofing right, in a conservation area or outside one.
A conservation area adds a second layer. The land counts as "article 2(3) land", which removes other householder rights, such as roof enlargements, and the planning team there can look closely at changes the street can see. A chimney can be on show from the road, and what happens to it can matter to the council even where the house itself is not listed.
The decision is the council's, and nobody outside it can give it for them. The workable approach is to describe the job to the planning team before work is booked: which stack, whether the whole stack or only the part above the roof is coming down, and whether the pots and any lead are going too. A written reply to that question is worth having.
Article 4 directions and the Broads
An Article 4 direction is, in GOV.UK's words, "a direction under article 4 of the General Permitted Development Order which enables the Secretary of State or the local planning authority to withdraw specified permitted development rights across a defined area." Where one applies to your road, work that would otherwise be permitted needs an application. Which rights a given direction removes is set out in the council's own notice, so for your property the sound step is to check with the council whether an Article 4 direction applies.
Inside the Broads executive area the planning authority changes. The Broads Authority says: "We are the local planning authority for all land and properties within our executive area." A chimney removal there goes to the Broads Authority for planning, not to the district council. Building control stays with the district council's team or a registered building control approver. Some places lie partly inside the executive area and partly outside it, so check the address with the council or the Broads Authority before assuming either way.
A conservation area and the Broads can overlap, and neither is a bar on taking a chimney down. They decide who looks at the application and how carefully.
Building Regulations, party walls and the roof
Removing a chimney breast always needs Building Regulations approval, whatever the planning answer is, so the building control route is settled alongside the planning route. The approvals stack up like this:
- Planning: the council says whether an application is required, and the Broads Authority does the same inside its executive area.
- Building Regulations: approval for the breast, from the council's building control team or a registered building control approver.
- Party wall: a breast on the boundary wall means the neighbour receives notice at least two months before the date on which the proposed work will begin. If they dissent, a surveyor takes over the dispute; it does not stop the job.
Our guide to chimney breast removal goes through the approvals in more detail.
Taking a stack down from the roof is separate work from taking out the breast inside. Where the stack goes, the roof has to be made good: the opening is closed, the covering is re-laid and any lead that met the stack is dealt with, which our guide to removing a chimney stack describes.
MyJobQuote gives averages for the two jobs (3 November 2026): around £2,500 for a chimney breast, and around £3,000 to £3,500 for taking the whole stack out along with its breast. These are third-party averages and not our price, which comes as one written total once the survey is done.
How we handle the sequence
Planning comes first: before work starts we ask the council what the job needs, or the Broads Authority for an address inside its area. Our survey looks at every slope, beyond the stack in question, and whatever else we noticed is described to you in plain words, so nothing found up there is left for you to discover later. If the stack is coming down, you can decide whether to deal with the surrounding tiles and gutter during the same visit, since the roof around the opening is being opened up anyway. A stack that is only being made safe, for example after storm damage, is a different job from a permanent removal, and the council's view may differ between the two.