The breast, the stack and why people take the breast out
The chimney breast is the column of brickwork that rises through the house from the fireplace, boxed in with plaster on the upper floors. At the roof it carries on as the stack, with its pots and cap, which is the part you can see from the street. People take the breast out to gain floor space in a room, to make a bedroom easier to furnish, or to open two rooms into one once the fireplace is no longer wanted.
The two parts are connected. A breast removed from a lower room can still leave the brickwork above it standing in the loft and rising through the roof. That upper brickwork has to be held up in a new way, or taken down as well. Which of those routes applies is the first question for any survey, because it decides what the roof will look like and what the quote covers.
If you are thinking only about the part above the roof, our guide to removing a chimney stack covers it. If the stack is staying and the aim is to stop rain entering a flue that is no longer used, capping a disused chimney is the page to read. The wider chimney repairs hub lists the other jobs that can be done on a stack.
What carries the weight once the breast has gone
A chimney breast carries its own weight and the weight of everything above it, down to the foundations. When the lower part is cut away, the brickwork higher up has nothing under it, so something else has to take the load. Two arrangements are a steel beam across the opening with supports at each end, or support brackets fixed into the wall on either side of the removed section. Which one suits a given house depends on the loads, the walls either side and the floors.
That support is a structural design, and it comes from a structural engineer or the building control team's guidance, not from a guess on the day. The design sets the size of the beam, the bearings at each end and what sits under them. The survey identifies the situation and the roof, and where a calculation is needed it says so plainly. The aim is for the person who signs off the support to have seen the loft, the walls and the roof timbers before the beam is specified, not afterwards.
If the whole stack and breast are coming out together, no support above is needed, but the roof then needs closing up where the stack stood. If only the lower breast goes and the stack stays, the new support is permanent, and it stays inside the walls for the life of the house. Buyers and their surveyors may later ask for the paperwork that shows it was done properly, so a record of the approval is worth keeping.
Two ways the work can go
Stack kept
- New support carries the stack
- Roof keeps its chimney
- Structural design needed
Stack removed
- No load left above
- Roof made good in full
- Flue ends below the slope
Building Regulations approval comes first
Building Regulations approval is always needed to remove a chimney breast, because it is part of the structure. That is the Planning Portal's wording, and it applies whether the breast is in a bungalow or a three-storey terrace. Building control is carried out by the council's building control team or by a registered building control approver, and the application is made to one of them before work starts.
The reason is not paperwork for its own sake. The Regulations exist so that someone with structural knowledge reviews what is holding the house up, and checks the finished work against it. The council or approver may ask for drawings and calculations, and may inspect at set stages. When the work is finished and accepted, a completion certificate from the council, or a final certificate from a registered approver, is the proof that the work was inspected.
In Great Yarmouth, the call goes to Great Yarmouth Borough Council's building control team, and an address in another council's area is checked with that council. We check the route with the council before work starts, so the order of events is settled early: survey, route confirmed, one written price, then the work. If you have an approved set of drawings from an earlier owner, send a photo of them on WhatsApp, because they show what was agreed for the house before.
Neighbours and the Party Wall etc. Act 1996
A breast can sit on a wall that belongs to two houses, and the Act covers that case. Section 2(2)(g) allows a building owner to cut away from a party wall any footing or any projecting chimney breast, jamb or flue. Doing so is work to a party structure, so the owner must serve a notice at least two months before the date on which the proposed work will begin.
Serving the notice falls to the owner, not the roofer. If the neighbour consents in writing, work can start earlier than the two months. No reply inside fourteen days is treated as dissent, and a surveyor is then appointed under section 10. A neighbour cannot simply refuse and stop the work, because the procedure decides how it is carried out. GOV.UK adds that you cannot assume that no response means they agree.
Questions about a party wall notice go to a party wall surveyor, not to building control. It helps to talk to the neighbour early, because the work will be heard and felt through the shared wall, and the roof or loft on their side may be affected if the stack above is changed. A conversation over the fence, before the notice arrives, goes down better than a letter that appears without warning, and the notice itself is a formal document that should be kept.
Sequence for a breast on a shared wall
- Owner decides on breast only, or breast and stack.
- Structural design is drawn up for the support.
- Owner serves party wall notice, at least two months ahead.
- Building control route is confirmed with the council.
- Neighbour consents or a surveyor is appointed.
- Work starts on the agreed date.
The loft and roof above the breast
For a roofer the interesting part is above the ceiling. In the loft the brickwork carries on up to the roof, and the ceiling joists, the rafters and sometimes the purlins are fitted around it. Taking a breast out below leaves that brickwork in place, so the loft side of the job is where the support meets the stack and where the roof timbers are checked.
If the stack is to stay, the lead flashings at the roof line stay as well, and the survey notes their condition while it is looking at the brickwork. A stack that is going to carry on standing for decades should not be left with tired flashings and loose flaunching just because the work below was the reason for the visit. Our guide to chimney flashing repair shows what is worth checking in that situation.
If the stack is to come down, the roof opening is framed in timber and the underlay and covering are carried across it. The new section is built to the same standard as the rest of the roof. With either route, the survey covers every slope, and you are told plainly what else showed up while the access was in place. A breast removal brings scaffold or a tower to the house, so it is also the moment to ask about anything else on the roof that has been worrying you, for example a slipped tile or a stained ceiling, and to mention it when you get in touch.
What the loft survey looks at
- Brickwork continuing up from the breast
- Rafters and joists fitted around the stack
- Condition of lead at the roof line
- Signs of damp on timber beside the stack
- Room for the new support to bear
- Flue liners or pipes that may need care
Old flues, dust and asbestos
Breaking into an old breast releases soot, dust and rubble, and in an older house it can uncover materials that were not planned for. The HSE advises that if the building was built or refurbished before 2000, assume that there is asbestos in it. Flue pipes and linings are among the places such material can sit, so the question is raised before the breast is opened.
HSE guidance treats asbestos cement removed without breaking it up as non-licensed work, and broken-up material as notifiable non-licensed work. Any asbestos waste needs a lockable skip, and a Norfolk or Suffolk recycling centre will not take it. Disposal is arranged separately from ordinary household rubble, and the written quote reflects it once the survey has shown what is there.
Inside the house, a breast removal also means floors and ceilings are cut back and made good, new plaster is needed where the breast stood, and the flooring is repaired. These are building trades rather than roofing, and a quote that states clearly which parts of the work it covers is easier to compare than one that stays vague about the finish. Floorboards, joists and plaster are all parts of the picture, and any firm quoting for the whole job should say who deals with each.
A published price, and what the written quote adds
MyJobQuote, in its chimney breast removal cost guide last updated 3 November 2026, says the average cost of removing a chimney breast is around £2,500. For taking out the entire stack together with the breast it gives an average of around £3,000 to £3,500. The guide states no VAT basis.
These averages describe a spread of jobs and not any one house. The structural support, the number of floors the breast passes through, access for the work and whether the stack comes down too all move the price, as does the state of the brickwork once it is opened up. The quote from us is one written total; where scaffold has to go on the pavement or the road, we arrange the licence with our scaffolder and it sits inside that single figure.
If a quote omits the structural design or the building control fee, ask who is responsible for them. A quote that leaves out the support beam has not priced the hardest part of the job, and a low figure that does not name it should be read with care. The same goes for the cost of making good inside the house. A price for the breast alone, with no word on floors, ceilings and plaster, may leave a second bill for a different trade, so ask what the figure includes before you compare it.
Published averages for breast removal
| Removing a chimney breast | around £2,500 |
|---|---|
| Removing the stack with the breast | around £3,000 to £3,500 |
MyJobQuote, remove chimney breast cost guide, last updated 3 November 2026. Averages as printed; no VAT basis is stated. Not Total Roofing prices.