Call 01493 277103

Slate roofing

Does a Slate Roof Need Ventilation?

A slate roof itself needs no vents cut into it, but the space under it may need airflow to clear damp air. Whether yours does depends on how the roof is insulated and which underlay lies beneath the slates.

Get a written quote

Call 01493 277103WhatsApp us

Roofer on scaffold beside a newly completed slate roof

The short answer

Where the roof space is cold, yes. Marley gives 25mm of eaves opening at 15 degrees or less, and 10mm above that, when the underlay is high-resistance. A warm roof follows other rules, so the way yours is insulated settles the question.

Why a roof space needs air at all

Warm air inside a house carries water vapour from cooking, washing and breathing. Some of it rises through the ceiling into the loft. If that air meets a cold surface, such as the underside of the underlay or the timber, the vapour turns back into drops of water. Those drops can soak rafters and battens, rust nail heads and lead to mould on the loft side of the roof, long before anything shows on the ceiling below.

Ventilation is the answer to that. Air that enters low, at the eaves, and leaves high, at or near the ridge, carries the vapour out before it settles. BS 5250, the standard on moisture in buildings, sets out how much opening is called for, and BSI lists the 2021 edition as current but under review.

None of this concerns the slates themselves. Slate is not harmed by damp air. The damage lands on the timber and the fixings that hold the slates, so the roof can look fine from the pavement while the structure above the insulation slowly wets.

Eaves and ridge: the figures Marley gives

For a cold roof, meaning one where the insulation lies on the loft floor and the space above is cold, Marley's figures change with the underlay. Under a high-resistance (HR) sheet, which Marley treats as not vapour-permeable, it states "25mm along the length of the eaves for pitches of 15° or less; 10mm along the length of the eaves for pitches of more than 15°."

Where the underlay is low-resistance (LR), the ceiling is tightly sealed and the covering is itself air-permeable, Marley says the 3mm of incidental ventilation at the eaves that ordinary construction gives is enough, so long as the product meets UKAS third-party certification conditions in full. Marley gives 5mm of ridge or high-level ventilation as the alternative.

Those figures are a minimum opening size along the full length of the eaves, not a count of vents. They also assume the openings stay clear, and a sealed or painted-over eaves detail, or loft insulation pushed hard against the slope, can shut a vent that looks fine from outside.

Marley's cold roof figures

  • HR underlay, pitch 15 degrees or less: 25mm along the eaves
  • HR underlay, pitch above 15 degrees: 10mm along the eaves
  • LR underlay with conditions met: 3mm at the eaves
  • Or the 5mm ridge or high-level alternative

Warm roofs follow different rules

A warm roof carries its insulation at the rafter line, so the roof space is inside the thermal envelope and no cold loft void exists. CNC Building Control, a partnership of five councils (South Norfolk, Norwich City, Broadland, King's Lynn & West Norfolk and Fenland), gives a warm roof guide saying a warm roof calls for none, where a cold roof must have it. That is CNC's guidance for the addresses it serves.

For anywhere else, such as Great Yarmouth, North Norfolk or East Suffolk, ask the building control team at the council, or a registered building control approver, which route applies to your roof. The right answer turns on the build-up: what insulation sits where, whether there is a vapour control layer, and which underlay lies under the slates.

Insulating an existing slate roof can turn a ventilated cold roof into something else without anyone intending it. Packing insulation between the rafters, for instance, can close the gap that the underlay relied on. Our page on insulating under a slate roof covers that decision.

Checking your own roof space

Take a torch up into the loft. Look for dark or furred timber near the eaves, damp or sagging insulation, rusty nail tips showing through the underlay and a musty smell. Then look from outside for slipped slates, which let in more water than any vapour does. Our guide to signs of a failing slate roof lists what can be seen from the ground.

Ventilation is also a part of any re-slate. Underlay, eaves detail and ridge are settled as a set, and our re-slating a roof guide shows the order the work runs in. A dry ridge can carry a vent, and BS 8612:2018, listed by BSI as current, is the specification that governs dry-fixed ridge, hip and verge components.

At Total Roofing Great Yarmouth the survey takes in the roof space under the slopes too, and the price comes back as a single written total. The slate roofing hub lists the full range of slate work.

Questions and answers

Do I need roof vents if my slates are old?

Not because the slates are old. What matters is the roof space beneath them: if it is a cold roof, it needs airflow, and the figures depend on the underlay. A roof that has coped for decades without can still need fixing if insulation has since been added. Have the loft side looked at before deciding, and bring any recent insulation work to the roofer's attention.

Can a dry ridge ventilate the roof?

A ridge detail can carry an opening, and Marley gives 5mm of ridge or high-level ventilation as the alternative to eaves ventilation where an LR underlay and air-permeable covering suit the roof. Whether that applies to your roof depends on the membrane and the ceiling, so check the specification first.

Who decides what ventilation a re-slated roof needs?

The specification for the roof decides it, checked against BS 5250 and the product certificates. For the Building Regulations route, ask the council's building control team or a registered building control approver. We look at the roof space during the survey so the quote covers what the roof actually needs.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote