Call 01493 277103

Lead roofing

What Is a Lead Apron Flashing?

An apron is the piece of lead on the low side of a chimney or wall, where water running down the roof meets it. Read on for what it does and how it is built.

Get a written quote

Call 01493 277103WhatsApp us

Lead roll roof on a bay window of a Victorian villa

The short answer

A lead apron flashing is a single sheet of lead at the downhill foot of a chimney stack or wall. Its top edge is fixed into the masonry and its lower part rests on top of the roof covering, so water running down the slope is carried across the joint and onto the tiles.

Where the apron sits

Picture a chimney stack standing up through a sloping roof. Rain runs down the slope and hits the upslope face of the stack, and it also runs down the sides and over the downslope face. The downslope face is the one the apron serves. It is a flashing laid flat across the foot of that face, running the full width of the stack and a little beyond it at each end.

The upper part is turned up the brickwork and held there, either in a chase, the groove described on our page about how lead is chased into a wall, or by a surface fixing. The lower part is dressed over the tiles or slates beneath, so water reaching the joint runs out across the covering instead of behind it. The same shape is used at the foot of a dormer front, or against a wall that rises across the slope.

Because the apron lies on the covering and not in it, the tiles under its lower edge have to sit flat. A tile that has slipped or tilted under the lead leaves a gap that wind can drive rain into, and the survey checks the course of tiles below an apron as well as the lead itself.

The other lead pieces round a stack

An apron is one of several pieces, and each is named for its position. The names vary a little between firms, so the table gives the plain meaning.

Lead pieces round a chimney stack
PiecePositionJob
ApronDownslope faceCarries water from the stack onto the covering
Step flashingSides of the stackFollows the slope up the wall in steps
Back gutterUpslope faceCatches water and sends it round the stack

The apron has to overlap the lead at the corners, where it meets the step flashings, and a gap there is one place a leak can start. The step flashings are made of separate pieces, each one tucked under the course of tiles beside it and stepped up the brickwork with the slope, so the apron does not have to follow the pitch itself. At the upslope end, the back gutter is formed with a fold that turns the water away from the face of the stack, then drains it out beyond the sides. When a stack has all three, a leak can come from any joint between them, which is why one patch may not settle the question. Our guide on types of lead flashing sets out the pieces for other junctions.

Code, lifespan and cost

Leadworx, which makes lead flashing, lists codes 3 to 8 under BS EN 12588 and says that code 4 has become the standard choice for general flashing work. Which code goes into an apron is a decision for the specification, since a wide apron on an exposed stack asks more of the metal than a narrow one. MyJobQuote says correctly installed lead flashing can last for over 80 years.

On price, MyJobQuote's page on chimney leadwork, updated on 22 September 2026, puts a patch repair to a chimney's lead flashing at around £200, with a full replacement averaging around £570. Both figures belong to chimneys and no other leadwork, so they are no guide to a valley, a bay or a flat roof.

A stack can need scaffold on the highway: that takes a licence from the county council, and we arrange it with our scaffolder. For an apron we give you a single written total after surveying the roof, and the lead flashing cost guide shows what each published figure covers.

How an apron fails

An apron takes more water than most flashings, because everything that runs down the stack passes over it. Several faults follow. The lead can split along a fold where it has been bent back and forth. The top edge can come out of the chase when the pointing has gone. The lower edge can lift off the tiles, which leaves the joint open to rain driven upslope by a gale.

A split or a lifted edge may look small from the pavement. The leak it causes appears on the ceiling beside the chimney breast, or as damp on the timbers beside the stack in the loft. The same stain can come from the pointing, the pot, the step flashings or the apron, so the whole stack is looked at, and whatever the survey turns up, we describe it to you in ordinary language, along with any other fault we saw nearby.

The lead roofing and leadwork hub lists the pages on each lead detail.

Questions and answers

Is an apron flashing the same as a back gutter?

No. The apron lies across the downslope face of a stack and sheds water onto the roof. The back gutter sits against the upslope face, where it catches water coming down the slope and sends it round the sides. They are separate pieces of lead and are fitted in a set order, with the apron overlapping where they meet.

Can an apron be repaired without replacing it?

A small split can be mended with a patch of the same lead, where the metal around it is sound. A flashing with several splits, or one whose top edge has come out of the wall, is judged on the survey. Checkatrade's June 2026 table gives lead flashing repairs at £50 to £70 per metre, exclusive of VAT.

Does sealant cure a leaking apron?

Sealant can close a hairline gap for a while, but it cannot hold a lead edge that has lost its fixing, and it can hide a split from the next person to look. Where the lead is at fault, the repair is to the lead. A picture sent to WhatsApp on 07880 284133 lets us look before anyone climbs up.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote