Call 01493 277103

Lead roofing

How Long Does Lead Flashing Last?

Published figures for lead run to decades, but each carries a condition. Here is what MyJobQuote says about lead flashing, what the other guides measure, and what cuts a flashing's life short.

Get a written quote

Call 01493 277103WhatsApp us

Lead roll roof on a bay window of a Victorian villa

The short answer

MyJobQuote says correctly installed lead flashing can last for over 80 years, and over 100 years for higher codes. Both figures depend on the word correctly: lead that is fixed too tightly, cut too large or set into a failing joint can split or lift long before it wears out.

What the published figures measure

The headline number comes from MyJobQuote's page on replacing leadwork on a chimney, last updated 22 September 2026. It says lead flashing that is correctly installed "can last for over 80 years", and in a bracket it adds over 100 years for higher codes. A code is the grade of lead sheet, a number from 3 to 8 that stands for thickness, and our guide to lead codes explained sets out how they work.

Two other guides give lifespans for lead, but they measure a different thing: a lead flat roof, not a flashing. They sit beside MyJobQuote in the table below so the three are never mixed up.

Published lifespans for lead
SourceWhat it coversFigure as published
MyJobQuoteCorrectly installed lead flashingcan last for over 80 years
HomeBuildingLead flat roof60-100 years
LessLead used to cover a flat roof50 to 100 years

Each of these is a general guide rather than a pledge about your roof. The numbers describe lead fitted well onto a sound surface, which is why the next section looks at what goes wrong with the fitting.

What cuts a flashing's life short

Lead is a soft, dense metal that does not rust, so it does not simply wear away. When a flashing fails early, the cause lies in how it was fitted or in what it is fixed to. The causes below are about fitting and fixing, not age.

  • Pieces cut too long, so that heat and cold stretch and shrink the sheet until it splits at a fold.
  • Fixings that grip so tightly the lead cannot move, which splits it at the point of fixing.
  • A code that is too thin for the detail, such as a light sheet over a large exposed run.
  • Mortar joints that have crumbled, so the top edge of the lead has nothing left to hold it.
  • Lead that has been walked on, or a tile that has been pushed down onto it.
  • Sealant smeared over a joint to hide a gap instead of a repair to it.

None of these shows from the pavement. A flashing can look whole from the ground while one overlap high on the stack has opened, which is why the checking is done up at the roof, standing at the junction.

Telling an old flashing from a failed one

Age on its own is not a fault. Lead forms a dull grey-white surface layer called patina, and that layer protects the metal under it, so a flashing that has gone from bright to chalky grey is behaving normally. Colour is the wrong thing to judge by.

What counts is the shape and the seal. Look for a split along a fold, a corner that has lifted away from the tiles, a gap where the top edge meets the wall, or a run of lead that has slid down its slope and left the joint bare. Our page on the signs your lead flashing has failed goes through each of these.

A stain on the ceiling beside a chimney breast, or damp on the loft timbers next to the stack, points to the flashing as one possible cause. Inspection has to take in the lead, the pointing and the tiles around it, since any one of the three could be behind a leak at a junction. Patching the lead alone leaves the other two untested.

Old lead, new covering

When a roof is re-covered, the flashings that sit against walls and chimneys come up for review. A new covering changes the height the lead has to meet, and old lead that has been folded and refolded may not take another dressing. The survey decides whether the existing lead can stay or needs renewing. Lead that is cracked at a fold or thinned at an edge is renewed, because a fresh covering laid against tired flashings leaves the weakest part of the junction as it was.

That call belongs to the roof as a whole, so the survey covers the lead, the covering, the timbers and the chimney together. What comes back is a straight account of each part, the sound lead named alongside any that is not, and then one written total price.

For the money side, see lead flashing cost, and for the wider picture start from the lead roofing and leadwork hub. A photo of a particular junction can go to our WhatsApp number beforehand.

Questions and answers

Is the 80 year figure a promise for my roof?

No. MyJobQuote's wording is that correctly installed lead flashing can last for over 80 years, which is a general statement with a condition attached. The age any particular flashing reaches depends on its code, how it was fixed, and the state of the wall or roof it is set into.

Does a grey, dull surface mean the lead is worn out?

No. The grey-white layer is patina, a natural coating that protects the metal beneath it. A flashing is judged on whether it has split, lifted, slipped or lost its seal at the wall, not on how dull or chalky it looks from the ground below, and a dull flashing can be entirely sound.

Can lead flashing be re-used when the roof is re-covered?

Sometimes the existing lead can be re-dressed, and sometimes it cannot. Lead that has already been folded back several times can crack on another bend, and a new covering may sit at a different height. The survey says which applies on your roof, and the written total price reflects that outcome.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote