The short answer
After storm damage to a commercial roof, make the building safe first, photograph the roof before any clearing starts, and tell the insurer. Temporary protection keeps the weather out while a survey sets the permanent repair, which can be carried out in phases for a single written total.
The first steps: safety, then a record
Start with people. A roof that has lost sheets, rooflights or flashings can drop pieces into a yard, a loading bay or a footpath, so keep staff and visitors clear of the ground beneath and beside the damaged section. Whatever loose material is still up there can go in the next gust.
Resist the urge to climb up for a look. A lifted or cracked sheet may not carry a body, and a flat roof with a torn membrane may hide soft decking underneath the surface. View it from the ground, from an upper window or from another safe spot.
Next, build a set of pictures before any clearing starts. The Financial Ombudsman Service says that "we'll usually look at expert reports and photos", so photographs from the outset count as evidence. Worth taking:
- Wide views showing where the damage sits on the building.
- Close views of torn flashings, split sheets and open joints.
- Water marks, drips and wet stock inside.
- Loose debris on the ground, before it is swept away.
If water is coming in, protect electrics and move stock away where that can be done safely.
Make-safe: what temporary protection is
Make-safe is the work that stops the damage getting worse while permanent repair is arranged. It can mean taking off hanging sheets, securing what is still fixed and fitting a temporary covering of sheeting or board over an opening. The aim is a roof that keeps the weather out and is safe to work around, not a finished job.
Because the temporary work goes onto damaged material, it needs an access plan before anyone steps onto the roof. Our fragile roof safety page explains why.
Temporary protection is a holding measure with limits of its own. A tarpaulin or board over a hole can lift in wind, and it does nothing for damage hidden beneath it, such as wet insulation or a bent purlin. The survey that follows looks at all of that, which is why make-safe is a first step and not a conclusion. Until the permanent repair is done, check the temporary cover after every spell of strong wind, because fixings on a temporary cover work loose in a way that permanent ones do not.
The insurer and the meaning of a storm
Tell the insurer, and read the policy. A commercial policy has terms of its own, covering what is protected and what you must do after damage, so the policy governs your claim. Nothing here predicts what an insurer will decide, since that turns on what the policy says and why the roof failed.
The Financial Ombudsman Service's guidance on home insurance shows how a storm is described when a complaint is looked at. Its wording is that "a storm usually involves violent winds, usually with rain, hail or snow", and that "Rain, hail or snowfall by itself can constitute a storm". Your own policy may define the term differently.
If you disagree with a decision, the Ombudsman's guidance gives a business up to 8 weeks to consider most complaints, and a customer has 6 months from the date on the final response.
A figure for the repair itself helps in that conversation. A business roof gets its price after the survey, and the figure in writing is one total for the repair. Keep that document with the claim papers, and keep any invoice for temporary protection as well.
Phased repair after a survey
A storm can damage several parts at once: sheets, flashings, rooflights, gutters and fixings in different corners of a roof. A phased repair takes them in order, beginning with whatever lets water in or threatens safety, then the next most pressing items, then the rest. The order is set by what the survey shows.
At Total Roofing Great Yarmouth the survey covers the entire roof before a quote is given, because damage seen from the ground can understate what has happened. A sheet that blew off may have been loose because its neighbours' fixings had already weakened. Whatever else the roof turns up is reported to you without padding, and one price in writing covers the work, whether it is carried out in one go or as a planned sequence. Highways Act s169 covers scaffolding that blocks a footway or road, and we arrange the licence with our scaffolder.
Related pages cover commercial roof surveys and commercial roof maintenance, and the wider range of work is under commercial roofing.