Call 01493 277103

Guide

Your Rights When You Hire a Roofer

Hiring a roofer is a contract for a service, and the law gives you rights in it whether or not you read the small print. This guide covers the standard of work, the 14-day cancellation period, the urgent-repair exception and what to do if a job goes wrong.

Get a written quote

Call 01493 277103WhatsApp us

A brick garage with a new grey membrane flat roof

What the law gives you in a roofing contract

When a roofer quotes, you accept and work is booked, you have a contract. It does not have to be a long document with a signature block: a written quote you have agreed to is enough to start with. Consumer law sits underneath it and applies whatever the quote says.

Three parts of that law matter most on a roof job. The first is the standard the work has to meet, set by section 49 of the Consumer Rights Act 2015. The second is the right to cancel a contract made at your home, under the Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013. The third is the duty on the trader to tell you about dispute resolution if you are unhappy, which since 6 April 2026 sits in section 308 of the Digital Markets, Competition and Consumers Act 2024.

This page is general information for householders in England. It is not legal advice on a particular dispute, and the Citizens Advice consumer helpline on 0808 223 1133 is the place to take a specific problem. The helpline is the route in: it can pass a complaint's details on to Trading Standards, which the public cannot do directly.

  • The work must be done with reasonable care and skill (Consumer Rights Act 2015, section 49)
  • A contract made at home can be cancelled within 14 days (Regulations 29 and 30)
  • An urgent repair you ask for is an exception (Regulation 28)
  • The trader must tell you how a dispute can be resolved (Digital Markets, Competition and Consumers Act 2024, section 308)

Reasonable care and skill

Section 49 of the Consumer Rights Act 2015 is headed "Service to be performed with reasonable care and skill". Every contract to supply a service to a consumer has this term in it, written down or not. For a roofer it means the work should be done to the standard of a competent roofer: tiles laid to the manufacturer's headlap and gauge, flashings dressed so water runs off them, fixings put in where they should be, and defects that the roofer sees on the roof pointed out rather than covered up.

The standard is not perfection and it does not guarantee that a roof will never leak. It asks whether the work was done carefully and competently. A leak after a repair is a reason to ask what went wrong. A ridge that comes off in a gale a week after it was bedded is a stronger reason, because the question there is whether the fixing was done properly for the roof's exposure. Marley notes that installing to BS 5534 "isn't required by law", but the standard is still the reference point when a dispute turns on how a covering was fixed.

Keep the evidence. Photograph the fault with the date on, retain the written quote and whatever messages passed between you and the firm, and note when you first reported the problem, in writing, so there is a clear record of what you said and when.

Do not carry out your own repair or hire a second firm to "fix" the first one's work before the first firm has seen the problem, unless water is coming in and you need a temporary cover. A firm that has not been given a chance to look can argue that it was not told, and a second roofer's changes can make it harder to show what the first one did.

The 14-day right to cancel a contract made at home

A roofer who surveys your roof and agrees a price with you at the house is not working from premises you visited, so the contract is an off-premises contract. Regulation 5 describes this as one "concluded in the simultaneous physical presence of the trader and the consumer, in a place which is not the business premises of the trader". A firm with no shop or office open to the public always falls under this rule, and so do we: a contract agreed at your house after a survey counts as an off-premises contract.

Regulation 29 gives the consumer the right to cancel an off-premises contract "at any time in the cancellation period without giving any reason". Regulation 30 sets the length: "the cancellation period ends at the end of 14 days after the day on which the contract is entered into". So if you sign on a Monday, the 14 days start on the Tuesday and the last day to cancel is the Monday fortnight, which is 14 days after the day you signed.

You can ask for work to start inside that period, but only if you make the request properly. Regulation 36 says the request must come on a durable medium: writing, email or anything else you can keep. The 14 days stay open even after an early start; but if you cancel once work has begun you may owe the roofer for what was done up to that point. The rule in one line: a contract signed at home following a survey carries 14 days to cancel, and an earlier start needs your written request.

To cancel, tell the firm clearly and keep proof you did so. An email gives you a timestamp and a copy. If you ring, follow it up in writing straight away so there is a record.

Myth

Once the roofer has started, my right to cancel is gone.

Fact

An early start you request in writing leaves the right in place; work done may be payable.

Urgent repairs: the one exception

The cancellation right has an exception for emergencies. Regulation 28(1)(e) removes it where "the consumer has specifically requested a visit from the trader for the purpose of carrying out urgent repairs or maintenance". Citizens Advice puts it plainly: you have no cancellation right if you invite the business into your home for urgent repairs or maintenance.

The exception is narrow. It applies to a repair you asked for, for something that really is urgent: a storm-damaged roof open to the rain, a leak coming through a ceiling, a chimney pot hanging loose over a path. It does not apply because a caller at your door talks about urgency, because a quote has a "today only" price, or because a roofer says the roof will fail soon. The visit has to be one you requested for urgent work.

Even where the exception applies, the contract is still a contract. Care and skill under section 49 apply to an emergency repair as much as to a planned one, and the dispute-resolution duty still applies. What you give up is the 14-day cancellation period, so if you are unsure about the price, ask for it in writing and take a few minutes before agreeing.

For the full rundown of the emergency rules, see urgent repairs and cancellation rights. If you are comparing a quote you have been given, our guide on how to read a roofing quote explains what to check for.

Before you sign: what to have in writing

Most disputes start with something that was said and not written. A good written quote removes most of that. Ask any firm for the following before you agree, and treat a refusal to put it on paper as information.

A firm that quotes by phone or by a figure scribbled on a card is harder to hold to its word than one that sends a document. If a price is given on the roof or at the door, ask for it by email or on paper before you reply, and read it when you are not being watched. A figure agreed under pressure is hard to unpick later, which is the situation the 14-day period for a contract made at home is meant to ease. The quote should be for the whole job, with a single total, so that you can compare it with another firm's quote on the same basis. When you compare quotes, check what each one covers, since a total that leaves out the scaffold or the waste removal is not the same total as one that includes them.

Check the firm too. A trading name with a landline, a postal address for letters and an email you can reply to is a better sign than a mobile number alone. Our roof maintenance checklist is a useful companion: a roof you have photographed before the job starts gives you a record to compare with after.

Ask for this in writing

  • The firm's full name and a means of contacting it
  • The work, described roof part by roof part
  • One total price for the whole job
  • What the quote covers, including access and scaffold
  • How and when payment is asked for
  • Your cancellation rights if you sign at home

If the work goes wrong: a sensible order

Start with the firm. Write to it, say what the problem is, attach photos and ask for a date to put it right. Many problems are settled at this stage, and a clear letter is also the record you will need if they are not.

If the firm does not respond, or the answer does not settle it, the Citizens Advice consumer helpline on 0808 223 1133 can explain your options. Since 6 April 2026 the Alternative Dispute Resolution Regulations 2015 are revoked, and the duty on a trader to tell a consumer about any dispute-resolution arrangement that is available if they are dissatisfied with the outcome now sits in section 308 of the Digital Markets, Competition and Consumers Act 2024. A trader that has told you about a scheme does not oblige you to use it, and dispute resolution is not an automatic next step.

Court is the last resort and a long way off. Citizens Advice can take you through the small claims route. Keep every document, every photo and every message, in date order, from the first quote onward. A tidy folder, paper or on a phone, makes each of the earlier steps quicker and shows a third party, whether an adviser, a mediator or a court, exactly what was agreed.

Insurance is a separate matter. If your roof was damaged by a storm, your claim is with your insurer, not with a roofer, and the Financial Ombudsman Service is the complaint route for an insurer. Our guide to roof insurance claims covers that route.

When a job goes wrong

  1. Photograph the fault and note the date
  2. Write to the firm with the problem and a date to fix it
  3. Ring Citizens Advice on 0808 223 1133 if it is not settled
  4. Use any dispute-resolution scheme the firm told you about
  5. Keep every quote, message and photo in date order

How we work, in the terms of this guide

Our survey comes before any quote and covers the full roof, so a slipped tile is looked at alongside the ridge, flashings and gutters. Findings are given in plain words, after which you receive one written total. Scaffold that has to stand on public highway is licensed by the county council, and we arrange the licence with our scaffolder.

Sign with us at home after the survey and the 14 days apply; to begin sooner, put your request in writing. A visit you ask us to make for an urgent repair brings no cancellation right with it. You can send photos by WhatsApp on 07880 284133 or ring 01493 277103 before any survey is booked. A photo is only a first look, and the survey is what lets us see the covering, flashings, gutters and the loft side of the roof together. Read the written total carefully before you agree to it, and compare it with any other quote on the same basis, checking what each one covers rather than looking only at the bottom figure. If something in it is unclear, ask for it to be changed in writing before you sign, not after. The rest of what we do is on our Great Yarmouth roofing page.

Questions and answers

Can I cancel a roofing job after signing at home?

Yes, for a contract made at your house, which the rules call an off-premises contract. No reason is needed to cancel: the period for doing so ends at the end of 14 days after the day on which the contract is entered into. The one exception is a visit you asked for so that urgent repairs can be carried out. Notify the firm in writing and keep a copy.

Does asking for an early start remove my right to cancel?

No. Work can begin inside the 14 days only if you request it on a durable medium, which means something you can keep, such as an email or a signed note. The request leaves your right to cancel intact. If you do cancel after work has started, the firm may charge for what it has already done.

What standard of work should a roofer meet?

The source is section 49 of the Consumer Rights Act 2015, under which a service has to be carried out with reasonable care and skill. In roofing terms that means competent work to the manufacturer's instructions and the relevant code of practice, which is not the same as perfection. If a repair fails, report it in writing with photos and the date you noticed it.

Who should I call about a roofing dispute?

Start by writing to the firm, saying what is wrong and what you want done. If that fails, ring the Citizens Advice consumer helpline on 0808 223 1133. It advises individuals, and it can pass a complaint's details on to Trading Standards, which you cannot do yourself. Keep your quote, photos and messages together in date order.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote