Call 01493 277103

Roof replacement

Re-Roofing With Solar Panels Fitted

A roof with solar panels can be re-roofed, but the panels have to come off the slope first and be refitted afterwards. Here is who does what, what changes under the panels and what the planning rules say.

Get a written quote

Call 01493 277103WhatsApp us

A roofer replacing the roof of a uPVC conservatory from a scaffold

The short answer

Yes, but the panels come off before the old covering is stripped and are refitted once the new one is down, by a solar installer. The roof beneath them is surveyed like any other, and the planning rules treat solar equipment separately from re-roofing, so check with the council.

The panels come off before the roof does

A re-roof strips the slope, and panels are fixed to that slope, so the array has to be lifted clear first. The system is electrical as well as mechanical: it makes current while the sun is on it, and the wiring and inverter belong to the solar installer's trade, not the roofer's. The sensible plan has the installer disconnect and remove the panels, the roofer renew the covering beneath, and the installer refit and reconnect.

That sequence needs two firms and one timetable. The panels sit off the roof for as long as the roof work takes, so the system generates nothing in that time, and a delay on one side holds up the other. Settle the order and the dates between both firms before the scaffold goes up, and ask each to confirm who is responsible for what in writing.

  1. The solar installer isolates and removes the panels and brackets.
  2. The roofer strips the covering and checks battens and underlay.
  3. The new covering is laid, with flashings where the array will return.
  4. The installer refits the array and reconnects it.

What changes on the roof beneath them

Panels are held by brackets or rails that pass through the covering to fixings in the roof structure, and each penetration is a place where rain can get in. A re-roof gives access to every one of them. Old fixing holes in tired battens, lifted flashings and cracked tiles around the brackets all show once the covering is off, which makes the re-roof a sound moment to put things right.

Two kinds of system exist, and they relate to the roof differently. On-roof panels stand above the covering on brackets, so the tiles continue underneath. In-roof panels replace the covering in their area and form part of the weather surface themselves, so the roofer works around them and the detailing at their edges matters. Which system you have affects who deals with what, and it is worth finding out from the installer's paperwork.

No product claim is made here for either type. The point is that the covering beneath and around a solar array is judged like any other part of the roof, including its timber and underlay.

Planning and building control

Re-roofing a house is normally permitted development under Class C, but Class C carries exclusions. Under C.1(d), development is not permitted where it "would consist of or include" the "installation, alteration or replacement of solar photovoltaics or solar thermal equipment". Whether taking panels off and putting them back counts as alteration or replacement is a question for the council, so ask it before work is planned rather than after.

Building control is separate from planning. A complete re-roof is beyond the line the Planning Portal draws for jobs that need no application, so the building control route is checked with the council, whether or not panels are involved. A new covering that is "15 per cent or more" heavier, in the Portal's wording, also brings approval in and a prior word with a structural engineer or surveyor.

Listed status, or an Article 4 direction covering the house, can alter that, so the council is asked about those too. Our Building Regulations for re-roofing guide covers the approval tests in full.

Questions to settle before anyone starts

Because two trades are working on one roof, put the shared points in writing. Ask which firm removes and refits the panels, which firm is responsible for the flashing round each bracket, and who makes good if a leak shows at a fixing after the array returns. Ask how long the system will be off, and who confirms the roof is ready for the refit. Ask too what the installer needs from the roof, such as a clear working area at the eaves and a safe route up, so that the scaffold is planned for both trades rather than one. A quote that treats the array as someone else's problem leaves a gap in the middle of the job.

At Total Roofing Great Yarmouth the survey takes in the roof under and around the array, and we put what we find to you in plain terms alongside one written total price for the roofing work.

The re-roofing process guide sets out the order of work on any roof, and it sits under roof replacement.

Questions and answers

Can the roofer take the panels off?

The array is a live electrical system, so isolating and disconnecting it is the solar installer's task, and the installer's own paperwork says what the brackets and wiring are. A roofer can strip around cleared slopes and renew the covering. Agree who does each step in writing so that neither firm assumes the other has it covered.

Is it better to re-roof first and fit panels afterwards?

On a roof that is wearing out, re-roofing first means the panels are fixed to a new covering and sound timber, and the roof does not need stripping around them later. If panels are already fitted, the covering can wait until the roof needs it, but the cost of lifting and refitting the array is then part of the job.

Will planning permission be needed to refit the panels?

That is a question for the council. Class C of the permitted development order, which covers re-roofing, excludes the installation, alteration or replacement of solar photovoltaics or solar thermal equipment, so do not assume. Ask whether refitting existing panels is covered, and also check listed status and any Article 4 direction.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote