Call 01493 277103

Roof replacement

Building Control Completion Certificate for a Re-Roof

A completion certificate is paper from building control, not from the roofer, saying that notifiable work has been checked against the Building Regulations. Here is who issues one, what it proves and why a solicitor wants it.

Get a written quote

Call 01493 277103WhatsApp us

Concrete tile roof with moss, lifted tiles and a cracked ridge

The short answer

It is the certificate building control issues when notifiable work is finished and accepted. Council teams call theirs a completion certificate, and registered approvers call theirs a final certificate. A full re-roof sits outside the Planning Portal's no-application test, so the council is asked about the route first.

What the certificate is, and what it is not

Building control is the system that checks notifiable building work against the Building Regulations. The certificate is its closing record: once the work is complete and accepted, the body that handled it puts that in writing. It is a statement about the work and the regulations, which makes it a different kind of document from an invoice, a quote, a photograph of the finished roof or a letter from a roofer.

Two kinds of body can do the checking. The certificate from a council's building control team is called a completion certificate; one from a registered building control approver is called a final certificate. The names differ, but for a sale both do the same job. The roofing firm is neither of them, so a firm that offers its own certificate in place of one from building control has offered something else.

  • Council building control team: a completion certificate.
  • Registered building control approver: a final certificate.
  • A roofer's invoice or receipt: neither of these.

Why a re-roof brings building control in

Re-roofing has a national yardstick. In the Planning Portal's guide, an application is normally not needed where "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof" is affected. A complete re-roof lies far beyond the second limit, so whatever the covering, it is a job for building control rather than one that slips under the line.

A change of covering can also trigger the rules by itself. The Planning Portal gives approval as the answer where the new covering lifts the weight carried by the roof by "15 per cent or more", or where its fire performance will be significantly different. Approved Document A treats it as a significant change when "the loading upon the roof is increased by more than 15%". On weight, the Portal's advice is a prior word with a structural engineer or surveyor.

None of this makes planning permission the issue. Re-roofing a house is normally permitted development under Class C. Planning and building control are two systems, and each has its own paperwork.

Which body covers your address

Building control follows the council boundary. South Norfolk, Broadland and Norwich addresses are served by CNC Building Control, a partnership of five councils (South Norfolk, Norwich City, Broadland, King's Lynn & West Norfolk and Fenland), operating from its Norwich office; its general line is 0808 168 5041. North Norfolk District Council runs its own building control team (01263 516345).

If the house is in Great Yarmouth borough, check with Great Yarmouth Borough Council's building control team; if it is in East Suffolk, check with East Suffolk Council's building control team. Whichever applies, the route is settled with the body that covers your roof, and we check it with the council before work starts. Which team applies follows from the property's address, never from where the firm is based.

In the Broads, planning for land inside the Authority's executive area goes to the Broads Authority. The Authority does not carry out building control, so no certificate for a roof ever comes from it. That job stays with the district council's team or a registered approver.

Why a buyer's solicitor asks to see it

A sale prompts questions about what has been built or altered since the house was last bought. A roof renewal is work to the part of the building that carries the weather, so a solicitor may ask for the certificate, or for proof that building control dealt with it. When the answer is a shrug, the sale can slow while the seller sorts out what can be supplied.

The certificate has a second life long after the roof is finished, when the house changes hands, a mortgage is arranged or a surveyor asks what work has been done. Put it with the title deeds the day it arrives, and ask any firm you hire at the outset which body will check the work and who will deal with it. Asking after the scaffold has come down is the slow way to learn the answer.

If a certificate has gone missing, the building control team that covered the address at the time is where enquiries begin. Our guide to Building Regulations for re-roofing sets out the tests in full, and the re-roofing process guide shows where the inspection falls. Both belong to roof replacement.

Questions and answers

Is a completion certificate the same as planning permission?

No. Planning permission decides whether a change may be built, and building control checks that the work meets the Building Regulations. Re-roofing a house is normally permitted development under Class C, but a listed home or an Article 4 direction can change that, so check with the council before you assume the planning side is settled.

Can a registered approver give the certificate instead of the council?

Yes. A registered building control approver gives a final certificate where the council gives a completion certificate. GOV.UK says private sector businesses must register with the Building Safety Regulator before doing this work, and the registration regulations came into force on 6 April 2024, although private building control existed before that.

Does a repair to a few tiles need a certificate?

Under the Planning Portal's test, a repair that affects less than 25 per cent of the building envelope and less than 50 per cent of the roof does not normally need a building regulations application. A new covering that is 15 per cent or more heavier brings approval in, so check before changing to a different type.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote