Call 01493 277103

Commercial roofing

Replacing Industrial Roof Sheets

Replacing roof sheets on a unit or warehouse can mean swapping a few damaged panels or re-sheeting a whole slope. This page covers matching profiles, asbestos cement sheets, composite upgrades and how the job is scoped.

Get a written quote

Call 01493 277103WhatsApp us

Rear flat roofs of a brick shop parade with flats above

The short answer

Replacing industrial roof sheets means taking off damaged or worn sheets and fixing new ones to the purlins, either in the same profile or in a different system such as insulated composite panels. Asbestos cement sheets are fragile and are handled under HSE's rules, so the material is established first.

Like-for-like or a new profile

A like-for-like replacement puts a sheet of the same profile in the place of the old one. The ribs, the pitch of the corrugations, the width and the gauge all have to match, because the new sheet laps onto its neighbours and the overlap only closes if the two shapes agree. Sheets that have been on a building for decades may no longer be made in that exact profile, and a near match leaves a gap at the lap.

Where a match is not available, the options are to replace a complete run of sheets from ridge to eaves in a new profile, or to re-sheet the whole slope. The purlins, which are the horizontal rails the sheets are fixed to, set how far a sheet can span, so the survey measures their spacing and checks their condition before a new profile is chosen.

Fixings, seals, flashings and the closure pieces at ridge and eaves are replaced along with the sheets. Re-using old fixings in new sheets leaves worn holes beneath the washers, and it undoes the purpose of the work. Our industrial roof cladding guide describes the sheeting systems in more detail.

Old cement sheets: fragile and possibly asbestos

Before any sheet is touched, the material has to be known. For a building built or refurbished before 2000, HSE says to assume asbestos is present, and it counts asbestos cement roofs as fragile in every case, which governs how anyone reaches the roof and how the sheets come off.

Cement sheeting taken off with care, and not broken, falls in HSE's non-licensed class, even where it has weathered. Once it is badly damaged or in pieces, the work becomes notifiable non-licensed work. HSE's EM9 guidance says: "Use a lockable skip for asbestos". Work on asbestos insulating board is a different category, and most of it is licensed.

A new roof laid over asbestos cement sheets is the over-cladding route, which leaves the old sheets in place and fixes the new system above them. It saves taking the cement apart, but it asks the old frame to carry both roofs for as long as the building stands, so it is a structural decision as well as a material one, and it is made after the survey. The over-cladding asbestos roofs guide sets out when that is possible and when removal is the answer.

Upgrading to insulated composite panels

Composite panels are made as a sandwich in a factory: a steel skin on the outside, an insulation core and a lining skin on the inside, fixed as one piece. Replacing single-skin sheets with composite panels changes more than the weather layer. It adds insulation and often an inner lining, and so it changes the building's thermal behaviour, its weight on the purlins and the details at eaves, ridge and roof lights.

That change brings in a regulatory step, so we check the planning or building-control route with the council before work starts. A structural check on the existing frame goes with it, because the purlins and rafters have to carry the new roof.

Condensation is part of the picture too. A single-skin roof that drips on cold mornings may stop doing so with an insulated panel, but only where the new roof is detailed and sealed properly at its joints. The survey looks at how the old roof behaves before a new one is specified.

How the job is scoped

The survey on the roof decides what is replaced. It looks at the following, and anything else that caught our attention is reported with it.

  • The number and position of damaged, cracked or corroded sheets.
  • The fixings along each run, and which have backed out or rusted.
  • The purlins: their spacing, their condition and any sign of movement.
  • Roof lights, gutters and flashings, with any that have failed.
  • Any sign of asbestos, or of corrosion that has spread from one sheet to its neighbours.

The decision then lies between a repair of the sheets that have failed, a re-sheet of a run or a slope, and a new roof system. A job on a unit that has to keep trading is planned around the business; our commercial roofing hub lists the guides on that and on surveys. Sheet replacement is priced once the survey is finished, and the quote comes as one written total covering the whole scope.

Questions and answers

Can I replace just the damaged sheets?

Sometimes. If the damage is limited to a few sheets, the profile can be matched and the neighbouring sheets and fixings are sound, replacing those sheets is a sensible scope. Where the whole roof shows the same wear, replacing a few leaves the same fault waiting elsewhere. The survey reports which situation applies.

Do I need to know whether my sheets contain asbestos?

Yes, before any work starts. For a building built or refurbished before 2000, HSE tells you to assume asbestos is there, and the material decides how the sheets are reached, removed and disposed of. A sample from the sheets confirms it, and a survey needs that answer to scope the job.

Is replacing sheets the same as over-cladding?

No. Replacing takes the old sheets off and fixes new ones in their place. Over-cladding leaves the old roof where it is and fixes a new system over the top. Which is possible depends on the condition of the old sheets and the frame beneath them, and on what the old sheets are made of. Over-cladding also leaves the old sheets and their fixings in place above the ceiling line, so it suits a building only where nothing beneath depends on seeing or reaching them.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote