Industrial roof lights are translucent panels set into a unit's roof to bring in daylight, and they cannot be trusted to carry a person. This guide covers how they are fitted, replacement, asbestos cement roofs and safe access, as part of commercial roofing.

Get a written quote

Call 01493 277103WhatsApp us

Rear flat roofs of a brick shop parade with flats above

What a roof light does in a factory or warehouse roof

A large unit has deep floor plates and few windows in the middle of the building. Roof lights solve that by letting daylight drop straight through the covering, so the floor can be worked and walked without every lamp switched on. On a sheeted roof the lights are panels cut to the profile of the neighbouring sheets, laid in the same run, lapped and fixed the same way. On a flatter commercial roof the same job is done by a framed rooflight that stands on an upstand, which is a raised kerb round the opening.

Because the panel is part of the roof covering, it is also part of the weatherproofing. Rain that runs down a sheet meets the lap at the next panel and carries on across it, so a panel that has moved, split or lost its sealant opens a path into the building at exactly the place where the roof is meant to be brightest.

Roof lights also differ from the sheets around them in how they age. A metal sheet and a translucent panel expand and contract by different amounts, so the fixings and sealed laps around a light carry more movement than the laps beside it. That is why a roof survey looks at the lights as a separate item, not only as a line in the roof area.

Parts of a roof light installation

  • The translucent panel or framed rooflight itself
  • The fixings that hold the panel to the purlins
  • Side and end laps against the neighbouring sheets
  • Sealant and filler pieces at the laps
  • The upstand or kerb on a flatter roof
  • The flashing that sheds water over the edge

Why every roof light is treated as fragile

A roof light can look like a solid panel from the ladder or from the edge, and that is the hazard. The Health and Safety Executive's guidance for asbestos cement roofs says plainly that "AC roofs are always fragile and cannot bear weight", and its sheet on working on those roofs points to the HSE's wider guidance on work on fragile roofs, where "Fragile roofs cannot bear weight." A translucent panel set in a metal or cement roof has the same status for anyone planning the work: until the panel has been shown to carry a load, the safe assumption is that it will not.

Fragility is also not a matter of age alone. A new panel can fail under a person as readily as an old one, and a panel can be hidden by moss, a dusting of grit or paint, or by lying in the same plane as the sheets beside it. A person walking along a run of sheets can step from a sound sheet onto a light without any change in feel underfoot.

For that reason the work is planned from below or from a platform, not from the roof surface. Surveys of roof lights are done from edge protection, a mobile access platform or a safe point that does not put a foot on the panel, and the reading of each light is made from there.

Myth

A thick, sound-looking roof light will carry a person across it.

Fact

HSE says fragile roofs cannot bear weight, so a light is treated as fragile until a competent person says otherwise.

Getting to the roof lights without stepping on them

The way a roof is reached decides how safe the job is before any panel is touched. The HSE's asbestos cement guidance, sheet a14, lists "Work at height" among the other hazards of that work and says "you may need a mobile access platform" for safe access. On an industrial roof that means edge protection at the eaves and gable, a platform that works from below the panel, or crawl boards laid over the supporting steel and not over the panels.

Pavements and roads add a second layer. Where the work needs a scaffold on the pavement or road beside the unit, the county council issues the licence under section 169 of the Highways Act 1980, and we arrange the licence with our scaffolder.

CDM 2015 requires a construction phase plan for every project, and it must be drawn up by the contractor or, on a job with more than one, by the principal contractor. On a commercial site the plan is where access, fragile-roof controls and the order of work are written down, and anyone going onto the roof should be able to read it first.

Access also decides what can be seen. A platform that reaches the underside of a run of lights lets the laps, fixings and cracked edges be read at arm's length, where a look from the ridge would show only the top surface. If the site cannot be shut down, the route is planned so that people and vehicles below are kept clear of the area under the lights while the work goes on.

Access order for a roof light job

  1. Agree the access route and edge protection with the site
  2. Mark every roof light as fragile before anyone climbs
  3. Work from a platform or crawl boards on the steel
  4. Lower the old panel and waste, never drop them
  5. Fix the new panel and check the laps from below

What the survey looks at before a panel is replaced

A replacement is no sounder than the structure it is fixed to. The survey reads the panel, then the sheets and purlins around it. A damaged panel may be sitting on a purlin that has moved, or beside a sheet whose fixings have worked loose, and a new panel put into that setting would repeat the fault. The whole roof is surveyed, and anything else seen on it is set out for you in plain words.

The points read on each light are the cracks and splits in the panel, the state of the fixing holes, the laps and the sealant that closes them, the filler pieces at the ridge and eaves, and any staining on the soffit lining or the floor below, which shows where water has been getting in. Condensation on the underside of a panel is a different problem from a leak and is read separately, so a damp patch under a light is not assumed to be rain.

Matching matters too. A replacement panel has to suit the profile it sits in, the same run length and the same side lap, otherwise the new part leaves a gap at its edge. If the roof sheets are being renewed or over-clad soon, the roof lights are better planned alongside that work than replaced twice. Our guide to industrial roof cladding covers the covering itself.

Reading a leak or a stain around a light

A stain under a roof light does not say by itself where the water got in. Rain can enter at the head of the panel, run down the underside of a sheet and appear at the foot, so the mark on the floor sits some way from the opening. A survey follows the water uphill from the stain to the lap, the fixing or the cracked edge that let it through.

Condensation is the other cause. Warm, damp air inside a unit meets a cold translucent panel and leaves drops on its underside, which run to the lower edge and drip. That looks like a leak and is not one, and replacing a sound panel does nothing for it. Telling the two apart is a matter of reading when and where the drips appear and whether the panel's laps are dry.

Fixings tell the third story. A fixing that is over-tightened can crack the panel round the hole, one left loose lets the panel lift and rattle, and a fixing driven through the wrong part of the profile leaves a gap that sealant is then asked to hide. Where the same fault repeats along a run of lights, the cause is in how the run was fitted, and replacing panels one at a time will not cure it.

Sealant has a limited job. It closes a lap that has been laid correctly; it cannot rescue a panel that has moved off its seating. A roof light that has been patched with sealant more than once is a sign that the setting, not the sealant, needs attention, and our commercial roof maintenance page covers how a recurring fault is followed up.

Priced after a survey

One roof light replacedPriced after a survey
A run of lights re-setPriced after a survey
Lights with the sheets renewedPriced after a survey

Commercial roof work is priced roof by roof. The written quote is one total price after the survey.

Roof lights in an asbestos cement roof

HSE's advice is plain: "If the building was built or refurbished before 2000, assume that there is asbestos in it". A unit from that period may have asbestos cement sheets with roof lights set among them. Because lights are replaced for daylight and for leaks, they are among the parts of that roof that get disturbed.

HSE treats the work by condition. Roof sheeting made of asbestos cement, if handled with care and removed without being broken up, is non-licensed work, and that includes asbestos cement that is weathered but not otherwise substantially damaged. Where the material is substantially damaged or has been broken up, the work becomes notifiable non-licensed work. Work on asbestos insulating board is mostly licensed work, which sits outside ordinary roofing, and among the places HSE says that board turns up are white soffit panels beneath roof eaves. Any roof where insulating board is suspected is stopped and identified first.

Waste has its own rule. HSE's disposal sheet says to "Use a lockable skip for asbestos", and the household exemption from consignment notes covers domestic hazardous waste "other than asbestos waste". Our guide to over-cladding asbestos roofs sets out the alternative to removal where the sheets stay in place.

Whichever category applies, the order matters: identify the material, keep people off the fragile surface, decide the method, then plan the waste route. Working out that sequence after the panels are already cracked is the wrong way round, because a broken sheet changes which category the job falls into.

Terms on an asbestos roof job

  • ACAsbestos cement, the material of roof sheets
  • AIBAsbestos insulating board, as in soffits
  • NNLWNotifiable non-licensed work
  • FragileCannot bear a person's weight

VAT, building control and the written price

A roof light replacement on a commercial building is priced once a survey has been done, since the figure depends on the number of lights, the profile, the access and what is found around each one. A general table would give a number that fits no particular roof. The written quote is one total price, and scaffold, where the job needs it, sits inside that total.

VAT works differently on a commercial job from a home one. HMRC's guidance says the domestic reverse charge covers "supplies of services reported within the Construction Industry Scheme". It is a rule between businesses, so it never appears on a homeowner's bill. A commercial customer should ask their accountant whether it touches their own purchase.

Whether a roof light change needs a Building Regulations application turns on how much of the roof and the building envelope is touched, and the Planning Portal's re-roofing guide for houses counts roof-lights as part of the building envelope. For a commercial unit, check with the council's building control team or a registered building control approver before work starts, and confirm the planning route with the council too.

If a roof light job is part of a larger plan, such as renewing sheets, over-cladding or a run of repairs across several units, say so when you ask, so the survey can cover the roof as one piece of work. A photo from the ground sent over WhatsApp helps to show the layout before the survey is booked.

Roof light questions from unit owners

Can I walk on an industrial roof light to inspect it?

No. HSE says fragile roofs cannot bear weight, and a roof light has to be treated as fragile until a competent person has shown otherwise. Inspect from edge protection, a mobile access platform or crawl boards laid over the steel, never from the panel itself. A WhatsApp photo taken from a safe position, such as from a window or from below, is enough for a first look.

Does my unit's roof have asbestos in it?

If the building was built or refurbished before 2000, HSE says to presume asbestos is present. Asbestos cement sheeting is one material to look for on an industrial roof, and roof lights can be set among those sheets. Until the material is identified, treat it as asbestos and keep people off the roof.

Can you replace one roof light without recovering the roof?

Yes, where the surrounding sheets and fixings are sound, but that depends on what the survey finds around the panel. A new light fixed into a worn setting would repeat the fault, so the whole roof is read first and anything else seen on it is set out for you in plain words. The written price is then one total after that survey.

Do I pay the reverse charge on a roofing invoice?

The domestic reverse charge applies to "supplies of services reported within the Construction Industry Scheme", and it does not show on a homeowner's bill. A VAT-registered commercial customer should confirm with their accountant whether it applies to their own purchase, because the answer turns on the customer's own status and on how the work is reported.