The short answer
It applies when roof work cuts into or alters a party wall, such as a flashing let into the neighbour's brickwork or a chimney breast cut back. The person having the work done must allow two months' warning, and a neighbour who objects, or stays silent for 14 days, triggers the surveyor procedure.
Which roof jobs the Act catches
The Party Wall etc. Act 1996 is not about the roof covering. It concerns the wall that two homes hold in common, and anything built into it. Two of the rights in section 2 touch roofs directly. Paragraph (j) allows work "to cut into the wall of an adjoining owner's building in order to insert a flashing or other weather-proofing", and paragraph (g) allows work "to cut away from a party wall … any footing or any projecting chimney breast, jamb or flue".
Both turn up on a terrace or a semi. A new run of lead stepped into the neighbour's brickwork is a cut into masonry that is partly theirs, and a breast that projects on both sides of the party wall forms a single shared mass of brickwork.
Removing a chimney breast always needs Building Regulations approval, because it is part of the structure. A party wall notice is also needed when the breast stands against a shared wall.
A repair that never reaches the shared wall, such as replacing a few slipped tiles on your own slope, is not what those paragraphs describe. If you cannot tell whether a job reaches the wall, ask the roofer to say exactly where each flashing will be fixed before you sign.
Notice: who sends it and how much warning
Responsibility rests with the building owner, meaning whoever is having the work done, and the notice goes to the adjoining owner. For work to a party structure, section 3 requires the notice to be served "at least two months before the date on which the proposed work will begin". Cutting a flashing into the neighbour's wall and removing a projecting chimney breast both fall under that rule.
Other work carries a shorter period. For a new boundary wall, section 1 requires notice "at least one month before he intends the building work to start", and section 6 asks for "at least one month before beginning to excavate" near a neighbour's building. The type of work therefore fixes the earliest date, and a single notice period does not fit every job.
The neighbour can shorten the wait. Work may begin sooner with "the consent in writing of the adjoining owners and of the adjoining occupiers". Keep that consent in a safe place: a spoken "fine by me" over the fence settles nothing when a disagreement comes later.
When the neighbour objects, or says nothing
A neighbour who consents in writing ends the question. A neighbour who objects, or never replies, starts a different process. Under section 5, a neighbour who has not consented "within the period of fourteen days" counts as having dissented, and the Act says "a dispute shall be deemed to have arisen".
GOV.UK is blunt about silence: "You cannot assume that no response means they agree to the works." Dissent does not act as a veto. Under section 10, where a dispute arises or is deemed to have arisen, the owners either agree one surveyor between them or appoint one each, and GOV.UK adds: "You must appoint a surveyor if you and your neighbour cannot agree." The surveyors settle the terms on which the work goes ahead.
The fourteen-day window concerns the neighbour's answer, and says nothing about when work may begin. The notice period still has to run, unless the neighbour has consented to an earlier start in writing.
Who deals with what
- The building owner serves the party wall notice and carries the process through.
- A party wall surveyor handles any dispute, and building control does not deal with party wall questions.
- Building control, or a registered building control approver, handles Building Regulations approval, which is a separate matter from the Act.
- The neighbour can consent in writing, and a copy of that consent is worth keeping with the quote.
- The title deeds may say who looks after a shared roof or stack, and our page on who is responsible for a shared roof covers that side.
At Total Roofing Great Yarmouth we survey the whole roof before we quote and tell you plainly where flashing or chimney work meets a shared wall, so the question can go to your neighbour early, with time to spare. Our guide to building control for roof work covers the approvals side, and under the Act it is the building owner, not the roofer, who serves any notice.