Call 01493 277103

Quick answer

Can You Cancel a Roofing Contract?

Yes, if you signed at home and are still inside 14 days. This page covers how the period is counted, what changes if work starts early and the one kind of job it never covers.

Get a written quote

Call 01493 277103WhatsApp us

Roofers on the brown tiled roof of a 1990s brick house

The short answer

Yes, if you signed at home you can cancel without explaining yourself until the end of 14 days after the day you signed. Work starts sooner only if you request it in writing. A repair visit you specifically asked for as urgent has no cancellation right attached.

Which contracts the 14 days cover

The Consumer Contracts Regulations 2013 give a cancellation right on off-premises contracts. Regulation 5 describes one as made in the simultaneous physical presence of the trader and the consumer, in a place which is not the business premises of the trader. A roofer who goes up to survey your roof and then has you sign the quote in your own home has made exactly that kind of contract.

Regulation 29 lets the consumer cancel at any time inside the period without giving any reason, so you do not have to explain a change of heart or point to a fault. Regulation 30 settles when the period closes. It runs to the end of 14 days after the day on which the contract is entered into. A signature on a Monday makes the following Tuesday day one, and the right lasts to the close of the Monday fortnight.

Citizens Advice sets out the same right on its page about cancelling building or decorating work, and its consumer helpline, 0808 223 1133, can talk you through a particular contract.

Starting the work inside the 14 days

A roof job may be booked for the coming weeks, so the work and the cancellation period can overlap. Regulation 36 covers this: on an off-premises contract, a start inside the period needs a request from you made on a durable medium, meaning something you can keep, such as a signed note, a letter or an email.

Asking for an early start leaves the right to cancel as it was. It does not shorten the 14 days, and the contract stays open to cancellation until the period has run out. What changes is the money: if you cancel after the roofer has started, a charge for the work already carried out can follow. That is worth weighing before you ask for the job to start early, which is one more reason to hold on to a copy of every document you sign.

Without a written request from you, nothing should be happening on your roof in those first 14 days. If a crew turns up early and you never asked for that, say so in writing at once and keep the message.

Urgent repairs carry no cancellation right

Regulation 28(1)(e) takes the right away in one situation. The consumer has specifically requested a visit from the trader for the purpose of carrying out urgent repairs or maintenance. In everyday terms, Citizens Advice puts the same idea this way: you have asked the business round to deal with something that cannot wait, and that is why the ordinary cooling-off period does not apply.

So the call you place yourself because water is coming through a bedroom ceiling falls on one side of the line, while a planned re-roof quoted after a survey falls on the other. Whether a given job counts as urgent depends on the facts, and a roofer's description of it does not settle the question. A re-roof you have been quoted for and booked in for next month is a planned job, whatever the state of the old covering. If you are unsure, ring the Citizens Advice helpline before you sign or pay.

For the price side of a call-out, our page on how much roof work costs gives dated third-party figures.

How to cancel, and what changes after the 14 days

  • Write it down: say which contract you are cancelling, the address and the date you signed.
  • Send it inside the period, not on the last day, and keep proof of the date.
  • Keep copies of the quote, any early-start request and any receipts.
  • Hold back any further payment until the position is clear.
  • Ring the Citizens Advice helpline if the roofer disputes the date or the amount.

Once the 14 days have run out, the right under these Regulations has gone, and your options turn on the contract itself and on whether the work is being done with reasonable care and skill, which section 49 of the Consumer Rights Act 2015 requires. If you are unhappy with a job already under way, our page on how to complain about a roofer covers the steps.

At Total Roofing Great Yarmouth, we look at all of the roof before quoting, and one written total price follows the survey. A contract signed in your home has the same 14 days as any other off-premises contract.

Questions and answers

Do the 14 days start on the day I sign?

The count begins the following day. Under regulation 30 the period runs to the end of 14 days after the day on which the contract is entered into, and the day you sign is not one of the 14. Mark the signing date on a calendar, count forward from the next day, and plan to send any cancellation well before the final evening.

Can I cancel if the roofer has already started?

Where you requested an early start in writing, cancelling within the 14 days is still open to you, but a charge for work already carried out may follow. Your request does not remove the right. Tell the roofer in writing straight away, and ring Citizens Advice on 0808 223 1133 if the amount you are asked to pay is disputed.

Is storm damage an urgent repair?

The exception applies where you specifically requested a visit for urgent repairs or maintenance. A roof open to the weather after a storm may fall within that, but each case turns on its facts. Take photographs of the damage, and ask Citizens Advice before you rely on a cancellation right for emergency work.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote