Which planning office covers my Bastwick plot, and why?
The short answer
The Broads Authority for land inside its executive area, the borough council for the rest. Building control stays with the borough council whichever side of the line.
On land inside its executive area, planning goes to the Broads Authority. In its words: "We are the local planning authority for all land and properties within our executive area". Part of Bastwick lies inside that patch, so a plot there that wants a new covering changing the roof's appearance, or a change to a listed building, puts the question to the Authority and not to the borough.
Nothing else moves with the boundary. The Authority has national park status, but it is not a building control body: regulations for a re-roof go to Great Yarmouth Borough Council's building control team, or to a registered building control approver, wherever the house stands. Both the planning side and the regulations side can be asked about together, and we ask before work is priced.
A farmhouse or barn near the river may sit on either side of the line, so the address decides, not the village name. Where it is unclear, the question goes to both offices, and the answer is in hand before the written price is given. The roof itself is surveyed in the same way throughout: covering, ridge, verges, flashings, gutters and the timbers seen from the loft. Our roof replacement page covers the whole-roof route from strip-out to new ridge.
Questions to settle for a Bastwick plot
- Is the plot inside the executive area?
- Which office takes planning?
- Is the building listed?
- Does a conservation area apply?
- Does an Article 4 direction apply?


