Call 01493 277103

Spray foam removal

Ventilating the Roof After Spray Foam Removal

Once the foam is out, the roof either has to breathe again or be insulated so that it need not. Here is how the two build-ups differ and what the eaves need.

Get a written quote

Call 01493 277103WhatsApp us

A row of old garages with a worn flat roof

The short answer

After foam removal, a roof insulated at ceiling level needs air passing through the loft and a roof insulated along the slope does not. Marley gives 25 mm of eaves opening at 15° or less and 10 mm above 15° where high-resistance underlay is used, so the chosen build-up decides the ventilation to fit.

Two ways to build an insulated roof

Warm air indoors carries moisture, and some of it drifts up towards the roof. The two build-ups handle that moisture in opposite ways. One keeps insulation along the ceiling and lets outside air wash through the space above, so damp air leaves before it condenses on chilly timber. The other puts insulation up on the slope, which keeps the timbers inside the warm envelope.

CNC Building Control publishes an easy guide to warm roofs. For a warm roof it says "No ventilation is required for these roofs." For a cold roof it says "Ventilation is required for these roofs." That is CNC's own guidance for the council areas it serves, quoted here to show how the two build-ups are separated.

Foam blurs the line. Sprayed against the underside of the covering, it seals the gap a cold roof depends on and makes the roof behave as a warm one. Removing it returns the roof to its earlier state, and nobody should close it up again before deciding which of the two build-ups it is to be.

Eaves openings for each underlay

How much opening a cold roof needs is tied to the underlay beneath the battens. Marley's guidance, which follows BS 5250, sets out two cases. If the underlay in use is the high-resistance (HR) type, it asks for "25mm along the length of the eaves for pitches of 15° or less; 10mm along the length of the eaves for pitches of more than 15°."

With low-resistance (LR) underlay, Marley says "fortuitous ventilation at the eaves via normal eaves construction (3mm) is all that is required", but only where the ceiling below is sealed tightly, the covering lets air pass through, and the certification Marley names under UKAS is in place. The other option it gives is a 5mm opening at the ridge or high level.

Marley treats HR underlay as impermeable to vapour, so the eaves gap is the moisture's only way out. BS 5250:2021 is the code of practice on managing moisture in buildings; it is listed as being current but under review. Neither case settles your own roof until someone has measured the pitch and looked at the covering and the ceiling.

Cold roof

  • Insulation at ceiling
  • Air moves above it
  • Open eaves needed

Warm roof

  • Insulation on slope
  • No ventilation required
  • Timbers kept warm

Keeping the air path clear

Vents at the eaves work only when air can enter and travel up the slope. New insulation stuffed into the eaves can plug that path, and so can stray offcuts of foam. Where a roof is meant to breathe, the points to check after removal are the soffit vents or eaves gaps at the foot of every slope, the ridge or high-level vent at the top, and the clear line between them above the insulation.

New insulation has to leave that line free. Our page on insulation after spray foam removal looks at what can go in afterwards and why that choice cannot be separated from the ventilation decision.

EST says closed-cell foam "doesn't let moisture pass through it easily" and that the rot risk "should be much lower with open-cell foam". Both lines are reasons to give a roof that has sat under foam a careful look at where its moisture will go from here, particularly if any of the old foam is being left in place in some areas.

Choosing the ventilation and checking it

The ventilation choice belongs to whoever designs the new build-up, which is one more reason to involve the specialist surveyor whose advice DESNZ recommends before any decision about foam. Building control is carried out by the council's team or a registered building control approver. Great Yarmouth Borough Council and East Suffolk Council each have their own, so contact the one covering your address, and mention that the roof has held foam when you do.

When quotes come in, ask three things: which underlay is going on, which ventilation figure goes with it and how the eaves will be kept open. For our part, we survey the whole roof before pricing and describe what turned up, and our price afterwards is written down as one total. The spray foam removal hub covers everything else that the service includes, and WhatsApp photos of the eaves from below are welcome on 07880 284133.

Questions and answers

Can I leave the roof unventilated once the foam is gone?

Only where the roof is built as a warm roof, for which CNC's guide says no ventilation is required. A cold roof does need ventilation, so insulation laid at ceiling level with no air movement above it is the wrong pairing. Which category your roof belongs to is settled by the survey together with the insulation scheme you choose.

Does a breathable underlay remove the need for vents?

Not by itself. Marley's low-resistance case still counts on some ventilation, 3mm at the eaves or a 5mm ridge vent, and it also relies on the ceiling being sealed well, the covering passing air and the certification being met. Check the product's paperwork with the supplier rather than assuming your underlay is the low-resistance kind.

Who checks that the ventilation is right afterwards?

Building control, where the work needs it, and your own eyes at the eaves. The council's team or a registered approver may inspect. Ask your contractor to show you the vent openings and the clear gap before the soffit is closed, and keep a photograph of each slope's eaves for your records.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote