Insulating the Loft After Spray Foam Removal

With the foam gone, the roof still has to hold heat in and let moisture out. This guide covers where the new insulation can go, the ventilation figures, the Part L targets, and the zero rate for insulation under HMRC's Notice 708/6, which runs to 31 March 2027.

Get a written quote

Call 01493 277103WhatsApp us

A bungalow conservatory with a new solid tiled roof

What the roof needs once the foam is off

Spray foam did two jobs at once: it insulated, and it sealed the underside of the roof. Taking it away removes both, so the roof needs a fresh plan for each, and that plan has to account for moisture as well as heat. Insulation chosen without thought for where the damp air of a house will end up can repeat the problem that sent owners looking for a removal in the first place.

Three decisions follow, and they are linked. The first is where the insulation sits: along the loft floor, between the rafters, or over them. The second is what happens to moisture: whether the roof void is ventilated, and which underlay sits beneath the covering. The third is how far the work has to meet the Building Regulations energy rules. The sections below take them in that order.

Everything here assumes the foam is off and the timber, felt and covering have been checked, which our guide to re-roofing after spray foam removal explains. If you are still deciding whether the foam should come out at all, start with our guide to spray foam surveys and the main page on spray foam removal, and return here when the roof has been looked at and the foam is out.

Insulating at the floor or at the rafters

Roofers describe the two layouts by where the insulation sits. With insulation along the loft floor, the space above stays cold and has to be ventilated. With insulation at or over the rafters, the roof void falls within the warm envelope of the house. CNC Building Control's easy guide to warm roofs states the ventilation point briefly: of a cold roof, "Ventilation is required for these roofs", and of a warm roof, "No ventilation is required for these types of roofs".

A roof insulated with foam under the rafters behaved as a warm roof, with its moisture problem hidden from view. Returning to insulation at ceiling level, with a ventilated void above it, is a different arrangement and needs ventilation that works. Choosing rafter-level insulation again is possible too, but it brings the same questions about moisture and about the covering above.

Which layout suits a house depends on how the loft is used. A loft kept for storage can take insulation laid along the floor. A loft turned into a room needs the insulation at the rafters, because the floor is no longer the edge of the warm space. If the loft is in use, or may be soon, ask for both options and ask which one the written quote prices, so that two quotes are set side by side on the same footing.

Two layouts side by side

Cold roof

  • Insulation at the loft floor
  • Roof void stays cold
  • Needs ventilation
  • Suits an unused loft

Warm roof

  • Insulation at the rafters
  • Roof void inside the heat
  • No ventilation needed
  • Suits a loft room

Ventilation figures and the underlay

Marley's guidance on ventilating a cold roof follows BS 5250, which is current in its 2021 edition. For a roof with a high-resistance underlay it gives "25mm along the length of the eaves for pitches of 15° or less; 10mm along the length of the eaves for pitches of more than 15°." It adds that underlay of the high-resistance (HR) type is not vapour-permeable, which is why that roof depends on the eaves ventilation.

Swap in a low-resistance (LR) underlay and the figures change. Marley says that with a sealed ceiling below and a covering that passes air, "fortuitous ventilation at the eaves via normal eaves construction (3mm) is all that is required, provided the requirements of UKAS Third Party certification are fully met", or alternatively "5mm ridge (or high level) ventilation can be used." The conditions attached to those figures count too: a ceiling that leaks air into the loft, or a covering that does not let air through, takes a roof outside that case.

In every case the figures describe the roof as built, and insulation can undo them. Pushed hard into the eaves, it closes the ventilation path, so a cold roof is insulated with the eaves kept clear. This is also where foam left behind at the wall plate shows up: a patch missed during removal can block the path and should be cleared before the new layer goes in.

Marley's cold-roof eaves figures

  • HR underlay, pitch 15° or less: 25mm at the eaves
  • HR underlay, pitch above 15°: 10mm at the eaves
  • LR underlay, sealed ceiling, air-permeable covering: 3mm eaves or 5mm ridge
  • All follow BS 5250, and the stated conditions must be met

Materials for a loft after foam

Mineral wool and rigid insulation boards are two ways of insulating a loft. Wool laid in rolls between and over the joists suits insulation at the floor, and boards fitted between and under or over the rafters suit insulation at the roof slope. Foam can be sprayed again too, and the Energy Saving Trust's wording on moisture applies to any new foam: closed-cell "doesn't let moisture pass through it easily", and the rot risk "should be much lower with open-cell foam". Whether to spray foam again after all this is a question for your surveyor and your lender, not a default.

The choice of material follows the layout, the space available and the budget. Thickness and price depend on the roof and the product, so the written quote is where those details belong. The table sets out what to ask about each option and is a prompt for questions, not a ranking of the options.

Insulation options and what to check
OptionWhere it sitsWhat to ask
Mineral wool rollsLoft floorIs the eaves path kept clear?
Rigid boardsBetween or over raftersHow are gaps and edges sealed?
New foamUnder the raftersWhich type, and what does the lender say?

Where boards or wool meet a gable wall or a party wall, the edge needs particular care, because a gap there lets warm air reach cold timber. A written quote should name the product and the thickness for each area, and say where the insulation stops at the eaves. A vague line such as "insulate loft" gives you nothing to hold the firm to.

The Part L energy targets

Approved Document L (2021 edition) sets the energy targets for roofs in existing homes in England. Table 4.2, the one for fabric that is new, gives the roof a figure of 0.15 W/(m²·K). Table 4.3, for existing elements, has a threshold of 0.35 and an improved value of 0.16: a roof that is renovated, or retained above that threshold, is taken to the 0.16 value where feasible. A U-value measures heat loss, so a lower number lets less heat through.

Paragraph 11.3 improves the whole element where more than 50% of its surface is renovated, and paragraph 4.13 allows a lower standard where the full upgrade is not feasible or would not pay back within 15 years. A foam removal that comes with a re-roof can bring a roof within that paragraph, so the insulation plan is worth settling before any new covering goes on. The 2026 edition of the document applies from 24 March 2027 only, and work done now follows the 2021 one.

Building control is carried out by the council's building control team or by a registered building control approver. Whether the work needs an application, and which of the two covers your address, are points to settle with the council, and we ask the council about the route before the work starts.

VAT and grants for loft insulation

HMRC's Notice 708/6 gives a zero rate for installing energy-saving materials, and its list of insulation includes "roofs or lofts". Zero rating applies to supplies "made between 1 May 2023 and 31 March 2027"; the reduced rate of 5% takes over from 1 April 2027. Roof coverings and repairs sit outside that list, so the rule concerns the insulation work itself and not the wider roofing job.

On grants, the schemes open in England pay for insulation, loft insulation among it, and for heating upgrades, and none of them funds roof replacement or repair. GOV.UK sets out who can apply. The Warm Homes: Local Grant can include loft insulation where the home is privately owned, carries an EPC of D to G, and the household income is usually £36,000 a year or less. The council then organises the work. The Energy Company Obligation, which can help some households on certain benefits, is closing on 31 December 2026, so look at GOV.UK or ask your council soon if you think you qualify.

None of this alters the way we price: a survey comes first, and a single written total follows it whatever grant or VAT rule applies. Total Roofing Great Yarmouth surveys the roof first, and what follows is one written total price.

Getting the quote and the order of work right

Insulation is the last major step in a foam removal job, and it is easy to rush because the roof looks finished by then. Treat it as part of the plan from the beginning. A roof that is stripped, re-covered and left with no clear insulation and ventilation plan hands the moisture problem back to the house, and a second round of work costs more than getting it right the first time.

Ask each firm to put the whole sequence in writing: the foam removal, any repair to felt, battens or timber, the underlay and covering, the ventilation arrangement, and the insulation with its product and thickness. When one quote leaves a stage out, you are comparing unlike things, and the cheaper figure may simply be the shorter job. Total Roofing Great Yarmouth gives its price only after a survey of the full roof, as a single written sum.

Check the layout against how you use the house. A loft you may convert later is better insulated at the rafters now than stripped again in three years. A boiler flue, a cold-water tank or a bathroom extractor fan venting into the loft also changes the moisture picture, and each should be mentioned during the survey. If you want to start with a photograph, WhatsApp one to 07880 284133 and we will look at it.

Order of work after the foam

  1. Foam removed and the roof structure checked
  2. Felt, battens and timber repaired where needed
  3. Underlay and ventilation arrangement settled
  4. Insulation fitted to the chosen layout
  5. Eaves and edges checked for clear air paths
  6. Written total price agreed before any start

Questions and answers

Should the loft be insulated at the floor or the rafters?

It depends on the loft. Insulation at the floor leaves a cold roof space that needs ventilation, while insulation at the rafters makes a warm roof, which CNC Building Control's guide says needs none. A loft used as a room points towards the rafters, and an unused loft suits the floor. Ask the quote to say which layout it prices.

How much ventilation does a cold roof need?

Marley gives 25mm along the eaves for pitches of 15° or less and 10mm above 15° where a high-resistance underlay is used, following BS 5250. A low-resistance underlay, with a sealed ceiling below and a covering that passes air, can need only 3mm at the eaves or 5mm at the ridge, if the stated conditions are met.

Is loft insulation zero-rated for VAT?

Under HMRC's Notice 708/6, the installation of insulation in roofs or lofts falls under the zero rate for supplies made between 1 May 2023 and 31 March 2027, and from 1 April 2027 the reduced rate of 5% applies. The notice concerns the insulation installation, not roof coverings or repairs. Read the notice against your own job.

Can I get a grant to insulate the loft?

Possibly. GOV.UK describes the Warm Homes: Local Grant as aimed at private homes in England rated EPC D to G; it can include loft insulation. Household income is usually £36,000 a year or less, with some exceptions. The Energy Company Obligation closes on 31 December 2026. All these schemes cover insulation and heating, not roof replacement or repair.

Get a written quote

Tell us about your roof

Hand dressing a lead ridge roll with a wooden bossing stick

10-year workmanship guarantee, in writing

Call WhatsApp Written quote