What U-Value Does a Roof Window Need?

A replacement roof window in England has a heat-loss target set by Approved Document L. This page gives the figure, explains the rating route, and shows where a rooflight is held to a different number.

Get a written quote

Call 01493 277103WhatsApp us

Two grey-framed roof windows in a slate terrace roof

The short answer

Approved Document L 2021 sets a replacement roof window in England at 1.4 W/m²K, or the Band B grade on the Window Energy Rating scale at the very least. The 2.2 W/m²K figure people quote belongs to rooflights, a separate type of unit. A lower U-value means less heat lost through the glass.

What a U-value tells you about a window

A U-value rates how readily heat passes through a building element. The unit is W/m²K: watts lost from each square metre of the element when the air on one side is a degree warmer than on the other. The lower the number, the slower the loss, so a window at 1.4 holds its heat better than one at 2.2 of the same size.

The number belongs to the whole window rather than the glass alone. The panes, the frame, the spacer between the panes and the gas fill all play a part, and a manufacturer tests the finished product and declares one figure for it. A figure quoted for the centre of the glass looks better than the figure for the whole unit, so compare like with like when you set two products side by side.

Windows also stand apart from the roof in the rulebook. Approved Document L gives the glazing a row of its own, so a roof window is checked against the window row and the roof around it is checked against its own insulation figure. The sections below take the window row first and the roof second.

The figure for a replacement roof window

Approved Document L, volume 1, deals with dwellings. Its 2021 edition, with the 2023 amendments, has applied in England since 15 June 2022. Table 4.2 sets the standard for new fabric fitted to an existing home. The window row reads "1.4 or Window Energy Rating Band B minimum", and the note beside it says the row takes in roof windows.

So there are two ways to comply. A product can declare a U-value of 1.4 W/m²K, or it can hold a Window Energy Rating in Band B. The words "Band B minimum" fix the floor: a product in Band B passes, a better band passes too, and a worse one falls short. Band B is the entry level and nothing in between.

One date is worth noting. Approved Document L 2026 starts on 24 March 2027, and only for building work outside the higher-risk category. Until that date the 2021 figures are the ones a job is measured against. Structure and escape have their own rules, covered in our guide to Building Regulations for roof windows.

Part L figures in Table 4.2

Replacement roof windowBand B energy rating, or 1.4 W/m²K
Rooflight2.2 W/m²K
New roof fabric0.15 W/m²K

Approved Document L, volume 1, 2021 edition incorporating 2023 amendments, Table 4.2, England.

Roof window or rooflight: why the row matters

The table lists the two separately because they are different products. A roof window is set in the rafters of a pitched roof and tilts or pivots open. Approved Document L defines a rooflight as a glazed unit installed out of plane with the roof surface, on a kerb or upstand, and notes it is sometimes called a skylight. Each is bought against its own row, and the data sheet should name the figure the product meets. The page on types of roof window shows the forms side by side.

One misreading is to take 2.2 as the roof window number. It sits in the rooflight row and is the easier of the two targets. A product declared at 2.2 has to take the second route in the window row and hold a Band B rating.

The roof is judged separately. In the Building Regulations a thermal element means a wall, floor or roof, with glazing and doors defined out of it. Changing the window therefore does not by itself bring the roof into the insulation rules, because each part has its own test.

When the roof around it is renewed too

A window job sometimes comes with new roof covering around it. Paragraph 11.3 of Approved Document L applies once more than 50% of one element's surface is renovated: the whole element is then improved where feasible. In the case of a roof, the target becomes the improved figure of 0.16 W/m²K in Table 4.3, against a threshold of 0.35 for a roof that stays as it is.

Paragraph 4.13 limits the demand. Where the full upgrade is out of reach, or would not repay itself within 15 years, the roof is taken to the lowest U-value that is both feasible and repaid inside that period. A complete re-roof is outside the Planning Portal's small-job test, which requires less than 25 per cent of the total 'building envelope' and less than 50 per cent of the roof to be affected.

Before anything is ordered, ask building control which route the address follows. For a like-for-like swap, our guide to replacing a Velux-type roof window carries the cost point: MyJobQuote gives an average of £1,100 for a standard mid-range Velux window (22 September 2026). Total Roofing Great Yarmouth surveys the roof beside a window, and reports what else turned up.

Questions and answers

Is a lower U-value always better?

For heat loss, yes: a window with a lower figure lets less warmth out. For compliance, the product only has to meet the target in Table 4.2. A window can also satisfy the rule through its Window Energy Rating, so a product whose U-value differs from 1.4 can still pass if it is rated Band B or better.

Does the same figure apply in Wales or Scotland?

The numbers here come from Approved Document L, which covers England. Wales and Scotland have their own building regulations, so the figures should not be assumed to carry across the border. For a job in England, the council's building control team or a registered building control approver confirms the route that fits the address.

What is a Window Energy Rating?

It is a banded grade given to a window product. Table 4.2 lets a replacement roof window comply by reaching Band B as a minimum instead of declaring 1.4 W/m²K. The product label or the maker's data sheet states the band, so ask for it in writing from the supplier before you place an order for the window.