How Long Does a Roof Window Take to Fit?

Fitting time is not one number. A swap into an existing opening is the smaller job, a new opening adds cutting and framing, and the lining indoors still has to be finished.

Get a written quote

Call 01493 277103WhatsApp us

A bright loft bedroom with an open roof window

The short answer

A like-for-like swap is the smaller job, because the opening, the rafters and the room lining already exist. A new opening adds cutting, framing and finishing indoors, so it runs longer. The survey shows which job you have, then a single written sum follows.

Two jobs that share a name

How long a roof window takes to fit depends on the fitting, and no two are quite the same. There are really two jobs. In the first, an old unit comes out and a new one of the same size goes into the hole it left. In the second, the roof has no opening at all, so one must be made before any window can go in.

A swap borrows work that was done years ago. The rafters were trimmed round the old frame, the battens stop at the right place, and the room below has a lining that already meets the frame. A new opening has to create each of those things, one after another, and some of them cannot start until the one before has been finished.

That is why no single figure would be fair for every roof. Length also moves with the covering, with how the roof is reached and with what is found once the old frame or the first tiles are lifted. A skylight and roof window job is judged on the roof itself, which is why a survey comes before the quote.

What a like-for-like swap involves

The order of work in a swap is short because most of the structure stays. The sash and the frame come out, the old flashing kit is taken away with them, and the wood round the opening is checked for damp. The new frame is fixed, the underlay is lapped round it, and a new flashing kit goes on from the sill upward, each piece lapping over the one beneath.

  • Old sash, frame and flashing kit removed.
  • Battens and rafter sides checked for rot or staining.
  • New frame fixed in the same opening.
  • Underlay collar and flashing kit built up from the sill.
  • Lining indoors sealed to the new frame.

MyJobQuote's roof window page, last updated 22 September 2026, says a Velux window replacement "costs around £100 less for a straightforward swap, as the opening is already in place". For a standard mid-range Velux window the same page gives an average of £1,100. Our guide to Velux-type window replacement covers matching sizes and kits.

What a new opening adds

Cutting a window into a plain slope starts with the covering. Tiles or slates are lifted back, the battens are cut, and a rafter is cut as well, which means the weight it carried has to be taken by new timbers framed across the gap. Those timbers have to be fixed before the window frame can sit on them.

Only then does the weatherproofing start, with the same underlay and flashing sequence as a swap. Each stage depends on the last, and a covering that is awkward to cut round, or a roof that needs a scaffold to be reached safely, lengthens the job further. Scaffolding on the pavement or road needs a highway licence from the county council, and we arrange the licence with our scaffolder.

A new opening is also a change to the building, so check the route first. In GOV.UK's technical guidance, roof lights and windows sit among the alterations that Class C of the householder permitted development rules covers, though a listed building or a conservation area can bring different rules from the council. Our guide to Building Regulations for roof windows sets out the checks.

Making good inside the room

The part of the job people forget is the ceiling or sloping wall. A roof window sits in the roof, but the opening needs a lining indoors: boards or plaster that run from the frame to the finished surface of the room. In a swap the old lining may be reusable, with the new frame fitting its edges. A new opening has a bare hole in the room that has to be framed, boarded and finished before it looks like part of the loft.

Plastering, filling and painting also need time to dry between coats, so the final stage can run on after the window itself is weathertight. That is separate from the roof work and is worth deciding about before the job starts, since a room can be in use or empty depending on what is being altered.

If you are unsure which job you have, a first look comes from a photo on WhatsApp, 07880 284133. The survey then settles it, and our price arrives as a written sum for the whole job.

Questions and answers

Does a roof window need a new opening or a swap?

A swap needs an existing opening of the right size, so check the frame size against the window you want. If the new unit is wider or longer than the old frame, rafters or battens must be cut and the job becomes a new opening. Our survey looks at the frame, the rafters either side and the covering before any figure is set.

Does the room get dusty during a roof window fit?

Work at the opening can bring dust and debris into the room below, especially where a lining is cut or old plaster is removed. Moving furniture clear and covering floors before the job begins is sensible. A new opening creates the most mess indoors, because boards and plaster have to be formed round it.

Is a roof window swap covered by permitted development?

GOV.UK's householder guidance names roof lights and windows under Class C, with conditions attached. A listed building, a flat or land with an Article 4 direction can differ, so check with the council before work starts, and read our planning guide, which sets out each of those checks in turn and explains where the rules differ.