The short answer
Not necessarily, but the figures are not comparable with planned work. MyJobQuote reports emergency roofer call-out costs typically range from £150 to £300, while extensive storm damage repairs can cost £1,200 or more (22 October 2026). For the permanent repair, we give one written total price once the roof has been surveyed.
Published call-out and storm figures
Third-party cost guides give a sense of scale. The table sets the emergency figures beside two planned-work figures, so the gap between a visit and a repair is easy to see. None of these is a price from us, and MyJobQuote states no VAT basis on its pages.
| Item | Figure | Source and date |
|---|---|---|
| Call-out by an emergency roofer | typically £150 to £300 | MyJobQuote, 22 October 2026. |
| Extensive storm damage repairs | £1,200 or more | MyJobQuote, 22 October 2026. |
| Replacing up to six broken tiles | £75 to £400 | Which? Trusted Traders, November 2025, excluding VAT. |
| Average roof repair | around £650 | MyJobQuote, 6 October 2026. |
Treat the call-out range as a marker for a visit and a make-safe, and the storm figure as a marker for large repairs. A handful of replaced tiles falls in a different band again. Our page on emergency roof repair cost goes through the same figures in more detail.
What can push an urgent price up
An emergency visit differs from a planned one in several ways, and each can move the figure:
- Access: a roof that needs a tower or scaffold costs more to cover than one a ladder reaches.
- The size of the opening, and how much covering must be fixed down to keep the weather out.
- The hour: a visit at night or on a bank holiday asks a roofer to work outside normal hours, so ask whether that changes the figure.
- Conditions: wind and wet can slow work, or make it unsafe, which affects the time on site.
Ask any roofer what the figure covers before you agree: the visit only, the make-safe, or a repair as well. A call-out figure is not a repair price. A price for a roof nobody has looked at is a guess, and a roofer who names one over the phone for damage you have only described is guessing.
If a make-safe needs scaffold that overhangs the pavement or the carriageway, the county council has to grant a licence for it. We arrange the licence with our scaffolder. Scaffold is part of the written quote.
Make-safe now, one written price for the repair
A make-safe stops the water, whereas the repair itself is a separate piece of work. Our order is the make-safe, then the survey, then the price. The survey reaches every slope and not only the leak, and any other fault is explained in plain words. The permanent work then comes as one written total price, so there is a single number to weigh, and it can be set beside the cost of doing nothing: more rain, more wet plaster, more ceiling to replace. A make-safe is the part of the job that limits that.
When you set our figure beside another firm's, find out what theirs includes: the repair itself, the new covering, scaffold and the disposal of what comes off. A quote that is silent on any of these leaves a gap that someone has to fill later. Our guide on how to read a roofing quote describes what a written quote should state.
The temporary stage is described in making a roof safe, and the emergency roof repairs hub covers the wider range of urgent faults and how they are handled.
Judging an offer when you are under pressure
A leak at night is exactly when a poor offer can seem acceptable, because the water is coming in and the person on the doorstep is offering to stop it. Slow down enough to ask for the basics in writing, and ask for time to read any contract for permanent work before you sign. Be wary of a demand for payment in advance for work not yet defined, and of pressure to agree on the spot to a large job that nobody has surveyed.
Your rights differ between the two stages. The cancellation rules carve out "the consumer has specifically requested a visit from the trader for the purpose of carrying out urgent repairs or maintenance", so the urgent visit itself carries no 14-day right. Permanent work agreed at your home after a survey does: the 14 days start on the day after signing, and work begins sooner only if you ask in writing.
If something goes wrong, the Citizens Advice consumer helpline on 0808 223 1133 gives guidance. Our blog post on how to tell a cowboy roofer goes through the warning signs.


