The short answer
It depends on the build-up. In CNC Building Control's warm roof guide, ventilation is not needed for a warm roof but is for a cold one. Marley's figure at the eaves, with high-resistance underlay above a cold void, is 25 mm of ventilation at 15° or less, and 10 mm above that.
Why a solid roof needs a moisture plan
A room with people in it, a kettle and wet coats makes water vapour. The vapour drifts with warm air towards the cold side of the roof, and any cold surface in its path turns it back into liquid. Under glass that happens on the pane and the drops run down. Inside a solid roof it can happen within the layers, unseen, and the damp then works on timber, insulation and plasterboard.
According to the Planning Portal, a new conservatory roof has to be ventilated properly, besides being structurally safe and energy efficient. The Portal's wording makes the moisture plan part of the Building Regulations side of the design, instead of something added afterwards.
The standard for managing moisture in buildings is BS 5250, and its 2021 edition is the current one. You do not need to read it. What matters to you is that the roof is designed either with a route for moisture to escape or with a layer that stops it reaching the cold side at all, and that someone has worked out which.
Where the insulation sits decides the venting
Insulation can sit in two places. Laid above or across the rafters as a continuous layer, it keeps the structure on the warm side of the roof. Placed lower, between or beneath the rafters, it leaves the space above it cold, and that space has to be vented so moisture can leave. The first is a warm roof and the second a cold roof.
CNC Building Control, a partnership of five councils (South Norfolk, Norwich City, Broadland, King's Lynn & West Norfolk and Fenland), puts the difference in its easy guide to warm roofs. Per that guide, ventilation is not needed for a warm roof but is for a cold roof. It is one partnership's wording, yet the division it describes applies in principle to any solid roof.
Which type applies depends on the product. The maker's data sheet, and the building control surveyor, will tell you which one the roof you are buying is. If the supplier cannot name the type of build-up, ask again before you order.
Two ways to build the insulation
Warm roof
- Insulation above the rafters
- Structure stays warm
- Vents are not needed
Cold roof
- Insulation below the rafters
- Space above is cold
- Vents are needed
The published ventilation figures
For a cold roof, Marley's guidance under BS 5250 gives set openings. A high-resistance underlay resists the passage of water vapour far more than a vapour-permeable one, so it needs air moving beneath it. Marley's figure is 25 mm at the eaves for a pitch of 15° or less, and 10 mm for a pitch above 15°.
A different pairing is possible. Where the underlay is low-resistance, the ceiling is airtight and the covering lets air through, Marley says the gaps in ordinary eaves construction, about 3 mm, can be enough if the product carries UKAS third-party certification. Alternatively 5 mm of ventilation at the ridge or other high point can be used.
These are Marley's numbers for its own products. Another maker's system can set different openings, and the design for your roof is the one that governs. Check which of the two pitch bands your roof falls into, because a conservatory roof can sit on either side of 15°. Our guide to insulating a conservatory roof sets out the build-ups.
What to ask and check
Ask the supplier which type of build-up the roof has, which underlay it uses and where air enters and leaves, and get the answers in writing. Ask building control what they want to see at inspection. For an address in Great Yarmouth or East Suffolk, the council's building control team is one route and a registered building control approver the other. Elsewhere, the council or registered approver that serves the address can say.
Airtightness at the ceiling is part of the plan, and it is easy to undo with a single badly sealed hole. Gaps round light fittings, hatches and the edges of the plasterboard let warm moist air into the cold space above, whatever vents are fitted. Our page on lightweight warm roofs shows a design that avoids the question.