The short answer
It depends on the fault, so no one length fits every roof. A slipped tile is a smaller job than a failed valley, and anything needing scaffold, a council licence or matching tiles takes longer. Norfolk County Council asks for 7 calendar days to process a scaffold licence, and Suffolk County Council for 10 working days.
Small repairs and what sets their length
A simple repair is a quick one in principle. Replacing a few broken tiles, re-bedding a ridge tile or refixing a loose flashing takes the time it takes to reach the spot, remove the damaged piece, check what is beneath it and fit the new one. The roof is not stripped, and a small job can be finished in one visit when the weather holds.
Even that depends on several things. The fault has to be found first, and a leak that has travelled along a timber can take longer to trace than one beside a chimney. The height and pitch of the roof change how long it takes to get to a spot and make it safe, and a roof that needs a ladder only is quicker to start than one that needs a platform.
Weather has the last word. Roofing is outdoor work at height, and wet or windy conditions can stop a repair part-way, so a job planned for a morning may be finished on another day. We give no hour or day count here because none can be fairly promised without seeing the roof.
What makes a repair take longer
Some repairs grow once the covering is lifted. A cracked tile may turn out to sit over a rotten batten, or a lifted flashing over damp brickwork, and the work then includes the layer beneath. That is a reason to look over the entire roof first, so that what lies underneath is allowed for and not found halfway through.
- Scaffold: a repair high up or along a gable may need a scaffold, which has to be arranged and put up before the roofer can start.
- Licences: a scaffold that stands over the footway or carriageway needs a county council licence, and we arrange the licence with our scaffolder.
- Materials: a covering that has to be sourced to match the existing one can take time to arrive.
- Permissions: some roofs, such as listed homes, need consent before work begins.
- Neighbours: work that touches a party wall can need notice first.
Each of those sits before the repair itself, so a job that takes a morning on the roof can take weeks from first call to finish.
Notice periods that are published
Where a scaffold stands on the highway, the county council issues the licence under the Highways Act 1980. Norfolk County Council's page says "Please allow 7 calendar days for applications to be processed." Suffolk County Council's page says "Applications require 10 working days notice to be processed." Each is the council's own published figure for its own area, and each is a lead time before a scaffold can go up, not a measure of the repair.
The Party Wall etc. Act 1996 sets longer periods where they apply. A building owner serves notice "at least two months before the date on which the proposed work will begin" for work to a party structure, for example a flashing cut into a shared wall or a chimney breast taken out, and "at least one month before he intends the building work to start" for a new wall on the boundary or nearby excavation.
Consent routes differ again. Stripping and replacing the whole covering sits beyond what the Planning Portal says normally needs no application, so we check the building control route with the council before starting. A small repair is a different case, and a listed house, or a house in a conservation area, goes to the council before work starts.
Matching tiles and getting a realistic answer
Matching a tile can hold up a repair on an older roof, because a tile that is no longer made has to be tracked down. How long that takes depends on the tile, so a clear photo of it, front and underside, is a sensible first step.
At Total Roofing Great Yarmouth nobody here prices a repair before the roof has been surveyed, and you are told plainly what the repair involves, including whether a licence or a hard-to-match covering comes into it. The figure then arrives as a single written sum. A photo sent to 07880 284133 on WhatsApp is a good way to begin.
For the cost side see roof repair cost, and for one common fault, slipped roof tiles. The hub is roof repairs.
Once the figure is agreed, the order is simple: licence and scaffold if needed, the repair, then the check that the fault is cured. The first two are the ones that add days before anyone is on the roof.