Call 01493 277103

Horsham St Faith, 25.4 miles west

Roofers in Horsham St Faith

Horsham St Faith lies west of Great Yarmouth by 25.4 road miles, a 33-minute drive. Whether the job is a plain repair or sits beside a Grade I listing, the whole roof is surveyed, the findings are plainly reported, and the council route is settled first.

Get a written quote

Call 01493 277103WhatsApp us

Victorian brick terrace street with slate roofs and chimneys
Modern brick houses with tiled roofs on a curving estate road

Priory, church and the Faiths conservation area

  • Two Grade I neighbours

    The Priory is listed Grade I (National Heritage List entry 1152454, first listed 19 January 1952), and so is the Church of the Blessed Virgin and St Andrew (entry 1372959, first listed 10 May 1961). Each follows its own consent route, set out in the answers below.

    A house beside either one is assessed separately, through any listing it carries and through the planning check for its address. The survey reads covering, ridge, verges and flashings in the same order whichever street the house is on.

  • The conservation area

    Horsham St Faith has a conservation area: Broadland District Council has designated the Horsham St Faith Conservation Area. Ask the council whether your own address falls within it before settling on another covering or an extra roof window.

    An Article 4 direction can remove further permitted development rights, so check with the council first. Broadland and South Norfolk's shared page says there are 21 conservation areas within Broadland.

  • Gildencroft and the wider list

    The Gildencroft is listed Grade II (entry 1050904). With 18 listed buildings lying nearby, a house that seems unremarkable from the street could still carry a listing, so do not assume that it does not.

    A listed roof needs consent in place before its character is changed. Our roof repairs service begins with the survey, and the consent question goes to Broadland before a price is fixed.

Deciding bodies for Horsham St Faith roofs

  • Planning: Broadland District Council decides; the parish lies outside the Broads executive area.
  • Building control: CNC Building Control, a partnership of five councils, with a Norwich office.
  • Broadland District Council has designated the Horsham St Faith Conservation Area; check your address.
  • Grade I church: Church of England faculty system, Diocese of Norwich; outdoor planning permission is separate.
  • Road or pavement scaffold: Norfolk County Council licence, which we arrange with our scaffolder.

The planning guide covers which roof jobs need consent, and a Horsham St Faith address has its route confirmed with the council ahead of the work.

Map of Horsham St Faith and the places nearest to it. Map tiles © Esri; map data © OpenStreetMap contributors.

Ask it straight · Horsham St Faith

A priory, a Grade I church and the rules around both

Horsham St Faith and Newton St Faith parish had 1,792 usual residents at the 2021 Census. These answers go through what shapes roof work in the village: how the Grade I church is approved, what a listing or a scheduled monument changes, how a heavier covering reaches building control, and who licenses a scaffold on the road.

Who approves roof repairs at the Church of the Blessed Virgin?

The short answer

The Church of England faculty system covers it, not listed building consent. Planning permission for outdoor work is a separate question.

The Church of the Blessed Virgin and St Andrew is listed Grade I (National Heritage List entry 1372959, first listed 10 May 1961). A Church of England building in use falls inside the ecclesiastical exemption, which means works are approved through the faculty system in the Diocese of Norwich. Listed building consent does not come into it, and that holds for a lead gutter, a ridge or a handful of slipped tiles alike.

The exemption stops there. Where exterior work is planned, planning permission is still needed, and Broadland District Council is the authority to ask. Building control remains with CNC Building Control or a registered building control approver. A church roof gets the survey a house roof would: covering, leadwork, gutters, then whatever else is seen from up there, reported to the churchwardens in plain words.

A church is only one of the parish's buildings, and every building carries its own status. Where there is doubt about which route covers which structure, the diocese and Broadland District Council are the two offices to ask before a scaffold goes up. The survey does not change with the route: it reads the whole roof and says what it found, parts nobody rang about included. The diocese's own officers can say what a faculty application needs.

Two Grade I buildings in the village

The church

  • Faculty system applies
  • Diocese of Norwich
  • Planning rules still apply outdoors

The Priory

  • Scheduled site: ask Historic England
  • Character is the test
  • National Heritage List entry 1152454

How does scheduled status at St Faith Priory differ from a listing?

The short answer

A scheduled monument is controlled separately, under the 1979 Act, and the Secretary of State decides. Listed houses use listed building consent.

St Faith Priory is a scheduled monument (National Heritage List entry 1003933). Scheduling works differently from listing. AMAA 1979 section 2 makes unauthorised works to a scheduled monument an offence. The Secretary of State decides, and Historic England receives the application, never the council. Each system has its own application route, so ask which one applies to your address.

A listed house takes a different road, under the Planning (Listed Buildings and Conservation Areas) Act 1990, which asks for consent before work "in any manner which would affect its character as a building of special architectural or historic interest". Broadland District Council, as the local planning authority for this parish, grants it, and The Gildencroft, Grade II, goes that way. The Priory, Grade I, is a harder case: it stands inside the area scheduled as St Faith Priory, and section 61 of the same Act takes a building included in the schedule of monuments out of the listed building rules. Where a structure there is itself scheduled, scheduled monument consent applies instead, so ask Historic England which consent covers which part.

The kind of roof job matters less than the status of the building under it. A like-for-like patch on a listed roof can still need consent if it changes the character, and anything touching the scheduled monument is a matter for the scheduled-monument system. Read the list entry for the exact address, or ask the council, and then arrange the survey so the roof's actual condition is on the table when those questions are answered.

Myth

A listed building and a scheduled monument share one consent route.

Fact

Listed buildings need listed building consent; scheduled monuments need consent from the Secretary of State.

How does a heavier covering reach building control in Horsham St Faith?

The short answer

A new covering "15 per cent or more" heavier than the old one brings in approval. A whole new covering goes to CNC Building Control or an approver first.

Horsham St Faith's building control is CNC Building Control, a partnership of five councils (South Norfolk, Norwich City, Broadland, King's Lynn & West Norfolk and Fenland); Horsham St Faith owners reach it through the Norwich office on 0808 168 5041. A registered building control approver is the alternative. The Planning Portal's re-roofing test asks for both limits to hold at once: "Less than 25 per cent of the total 'building envelope'" and "Less than 50 per cent of the roof is affected".

Weight sits outside those two limits. The Portal lists, among its triggers for approval: "You use a new covering material which increases the weight of the roof covering by 15 per cent or more." Before work begins, the Portal's own page suggests getting a structural engineer or surveyor to confirm that the roof can take the load. The roof timbers carry whatever is laid on them, which is why the survey notes the rafters, purlins and wall plates as seen from inside the loft, not just the surface.

Stripping and recovering a whole roof affects more than 50 per cent of it, so that job falls outside the no-application test whatever goes back on. The roof replacement service covers a full re-cover. A repair inside both limits is treated differently, and swapping a few broken tiles for matching ones is the plainest case. The survey also records the state of the existing covering, which helps show how much of the roof the planned work would affect.

How a re-roof question travels

  1. The survey notes the covering, the underlay and the timbers beneath.
  2. Both Planning Portal limits are tested against the planned work.
  3. A heavier covering prompts a structural check first.
  4. The route is confirmed with CNC Building Control or an approver.

Does Norfolk County Council or Broadland license a scaffold here?

The short answer

Norfolk County Council does, in its role as highway authority. We arrange the licence with our scaffolder, and Broadland District Council has no hand in it.

A frame on or above a Horsham St Faith footway or carriageway comes under section 169 of the Highways Act 1980 and needs its licence. The licensing body is the county, Norfolk County Council, so the district council is the wrong office to ring. Overhang counts as much as footprint: a frame that juts out above the footway is treated the same way, so the survey notes how close the eaves sit to the street.

Norfolk County Council charges £178.33 for the first 28 days and £178.33 again for each further 28 days. Its published line is "Please allow 7 calendar days for applications to be processed", and a fresh application is expected each time a frame is erected on the same site. A project that overruns one period is renewed, so the frame is not taken down halfway through the work.

We arrange the licence with our scaffolder. Churchyard walls, narrow lanes and a house set tight to the road can each shift where the base of the frame goes. That is easier to settle during the survey than on the morning the scaffolder arrives, and it is one more reason the layout is thought through before the price is set in writing. Once the layout is agreed, the licence is sought for the dates the job needs.

Horsham St Faith: ridges, conservatories, foam and asbestos

A ridge tile has slid along my Horsham St Faith roof: what does it need?

Note which tile moved from the ground, and leave the climbing to a roofer. Ridge tiles are bedded in mortar or held by a dry-fix system, and a slid one can mean the bedding has failed along that run. Marley says that since the 2015 amendments mortar "could no longer be relied upon as the only means of securing the roof covering", so the fixing is inspected too. Our roof repairs service begins with the survey.

Can a conservatory in Horsham St Faith have a solid tiled roof?

It can be done, but there are two checks. The Planning Portal says "A new roof must comply with building regulations", so the route is checked with CNC Building Control before work starts. On planning, the Portal also says: "If the change significantly alters the structure or appearance of the roof, then planning permission may be required." The planning authority for this parish is Broadland.

Does spray foam under the Horsham St Faith rafters stop a mortgage?

Not automatically. The Energy Saving Trust says that spray foam "doesn't automatically prevent you from getting a mortgage, but some lenders may ask for extra checks". Government guidance published in October 2026 adds that many mortgage providers are open to lending on properties with spray foam, subject to their own requirements. A specialist surveyor's advice comes before any decision about removal.

Can I put broken garage roof sheets in a Horsham St Faith bin?

No. If the sheets are asbestos cement, Norfolk County Council does not accept any asbestos at its recycling centres. HSE's wording for the waste is "Use a lockable skip for asbestos", and household asbestos sits outside the consignment-note exemption. Judge the sheets from the ground, because HSE says "AC roofs are always fragile". A specialist contractor, not a household bin run, is the route for removal.

Is the roof of The Priory covered by the same rules as my terrace?

No. The Priory is Grade I and stands within the scheduled St Faith Priory site, so Historic England is the first call on which consent applies before roof work touches it. An unlisted terrace is judged by the planning check for its address, including whether it lies inside the Horsham St Faith Conservation Area, which Broadland District Council can confirm. Our roof repairs survey reads both the same way.

Horsford, Spixworth and neighbouring parishes

Horsham St Faith roof quote

Tell us about your roof

10-year workmanship guarantee, in writing

Call WhatsApp Written quote