Does re-roofing my Blofield house need building control?
The short answer
A whole new covering does, since it touches more than 50 per cent of the roof. A small repair normally does not, provided it stays inside both Planning Portal limits.
Building control for a Blofield address is run by CNC Building Control, a partnership of five councils (South Norfolk, Norwich City, Broadland, King's Lynn & West Norfolk and Fenland), working from its Norwich office on 0808 168 5041. A registered building control approver is the alternative. For re-roofing the Planning Portal sets a test: no application is normally needed where "Less than 25 per cent of the total 'building envelope'" is affected and "Less than 50 per cent of the roof is affected". The two tests apply together, so passing one is not enough.
Lifting every tile on a Blofield house crosses the second limit, whatever goes back on, so the job is put to building control before the first batten is taken up. Weight can trigger approval too. A new covering "15 per cent or more" heavier than the old one needs it, and the Planning Portal suggests a structural engineer or surveyor looks at the roof beforehand. For that reason the survey goes into the loft to read the rafters, purlins and wall plates, and does not stop at the surface.
CNC's own page on repairs adds a caution: "If the repair work is significant, or the building is thatched then the Building Regulations may apply." A modest fix that stays inside both limits belongs on our roof repairs page, while stripping and recovering sits under roof replacement, where the building control step comes first.
Parts checked on a Blofield survey
- Tiles or slates: slipped, split or gone
- Ridge line and any hip ends
- Gable verges and valley gutters
- Flashings at walls and chimney stacks
- Rafters, battens and underlay from the loft
- Gutters and downpipes at the eaves