Can a heavier covering go on my Blofield Heath roof?
The short answer
A covering 15 per cent or more heavier needs building regulations approval, and the Planning Portal advises a structural check first.
The Planning Portal gives the rule: approval is needed where you use a new covering that increases the weight of the roof covering "by 15 per cent or more". It advises a check with a structural engineer or surveyor before work begins. Approved Document A frames the same point as a roof load "increased by more than 15%". Either way, the question is about how much extra weight the existing roof structure will carry.
That is why a Blofield Heath survey goes beyond the surface and into the loft. The rafters, purlins, ridge board and wall plate are read from the loft for sagging, splits, damp and old repairs, since the structure under the covering is what takes the load. The Portal names a further trigger. If a new covering would behave "significantly different" in a fire from the one it replaces, approval is needed on that ground as well, which is a point for the survey to raise before a covering is chosen.
Building control for this part of Broadland is CNC Building Control, a partnership of five councils (South Norfolk, Norwich City, Broadland, King's Lynn & West Norfolk and Fenland), reached from its Norwich office on 0808 168 5041. A registered building control approver is the other route. Our roof replacement page covers the whole job.
Structure read from a Blofield Heath loft
- Rafters: splits, sag and old repairs
- Purlins and ridge board
- Wall plate and its bearing
- Underlay condition and damp marks
- Battens: rot or loose fixings