How are roof repairs to Forncett's two churches approved?
The short answer
St Mary's goes through a faculty from the Diocese of Norwich, not listed building consent. Outside work may also need planning permission from South Norfolk Council.
Entry 1304627 lists the Church of St Mary at Grade I, from 7 December 1959. Because St Mary's is Church of England and in use, the ecclesiastical exemption applies, and a faculty from the Diocese of Norwich is the approval for roof work in place of listed building consent. A parochial church council that is planning a re-leading can ask the diocese about the faculty while the survey is under way. The Church of St Peter, entry 1152619, also Grade I, lies nearby.
A faculty replaces one consent and no other. Where work to the outside needs planning permission, South Norfolk Council decides it, and building control remains with CNC Building Control or a registered building control approver, so three separate questions go to three separate bodies. For St Peter's, the consent route is one to confirm before any work is planned.
A church roof survey is divided into the nave, aisles, porch and tower, with covering, lead, gutters and timbers looked at in each. The churchwardens hear what the survey found, together with any extra faults seen on the way round. Photographs can come first by WhatsApp (07880 284133); we say what a photograph shows and what only a close look from the roof can settle. Our lead roofing page explains the lead that church roofs carry.
Questions for each church roof
- Which part of the roof is failing?
- Is lead or covering the problem?
- Do the gutters carry water clear?
- Faculty first, then planning, then building control


